My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Radial stiffness at low strain,(3) <br /> kN/m @ 0.5% strain 300 <br /> I Radial stiffness at low strain,(3) <br /> (lb/ft @ 0.5% strain) 20,580 <br /> I Durability <br /> Resistance to chemical 100% <br /> degradation(4) <br /> I Resistance to ultra-violet light and 100% <br /> weathering(5) <br /> I12 Notes: <br /> 3 <br /> 4 1. Load transfer capability determined in accordance with GRI-GG2-87 and GRI-GG1-87 <br /> I 5 and expressed as a percentage of ultimate tensile strength. <br /> 6 2. In-plane torsional rigidity measured by applying a moment to the central junction of a <br /> I7 225mm x 225mm specimen restrained at its perimeter in accordance with U.S. Army <br /> 8 Corps of Engineers Methodology for Measurement of Torsional Rigidity, (Kinney, T.C. <br /> 9 Aperture stability Modulus ref 3, 3-1-2000). <br /> 10 3. Radial stiffness is determined from tensile stiffness measured in any in-plane axis from <br /> I11 testing in accordance with the scope of ISO 10319:1996. <br /> 12 4. Resistance to loss of load capacity when subjected to chemically aggressive <br /> 13 environments in accordance with testing to ISO12960 as part of a durability assessment <br /> I14 in accordance with ISO13434:1999 7.3 <br /> 15 5. Resistance to loss of load capacity when subjected to ultra-violet light and weathering in <br /> 16 accordance with testing to EN12224 as part of a durability assessment in accordance <br /> I17 with IS013434:1999 7.2 <br /> 18 6. All dimensions and values are typical unless otherwise stated. <br /> 19 <br /> I20 Alternate Structural Soil Reinforcement Materials — Alternate structural soil reinforcement <br /> 21 materials will be considered if submitted at least 15 days prior to bid letting in accordance with <br /> 22 the following conditions: <br /> 23 <br /> 24 1. Geotextile materials shall not be considered as an alternate to geogrid materials for <br /> 25 subgrade improvement or base/subbase reinforcement applications.A geotextile may be <br /> 26 used in the cross-section to provide separation, filtration or drainage; however, no <br /> I27 structural contribution shall be attributed to the geotextile. <br /> 28 2. Alternate geogrid materials shall not be used unless submitted to and pre-approved in <br /> 29 writing by the Engineer. Consideration of alternate geogrid products will not be evaluated <br /> I30 based solely upon index and strength properties outlined in Section 2.02.A. In the event <br /> 31 that material index properties of an alternate product do not satisfy the requirements set <br /> 32 forward in this specification, then a separate design incorporating the alternate geogrid <br /> I33 product must be submitted for approval by the Engineer. Submittal packages for alternate <br /> 34 geogrid materials must be in the form of an engineered design certified by a licensed <br /> 35 professional engineer. Submittal must include, but not limited to, the following items: <br /> I36 a. Design pavement/unpaved surface typical section including the alternate <br /> 37 geogrid product <br /> 38 b. Letter summary of the alternate design describing the basis for design sealed by <br /> I 39 a licensed professional engineer. <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 86 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.