My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6-12.AP6 <br /> 2 Section 6-12, Noise Barrier Walls <br /> 3 April 2, 2018 <br /> 4 6-12.2 Materials <br /> 5 In the first paragraph, the reference to "Aggregates for Portland Cement Concrete" is revised <br /> 6 to read: <br /> 7 <br /> 8 Aggregates for Concrete 9-03.11 <br /> 9 <br /> 10 6-13.AP6 <br /> 11 Section 6-13, Structural Earth Walls <br /> 12 April 2, 2018 <br /> 13 6-13.2 Materials <br /> 14 In the first paragraph, the reference to "Aggregates for Portland Cement Concrete" is revised <br /> 15 to read: <br /> 16 <br /> 17 Aggregates for Concrete 9-03.1 <br /> 18 <br /> 19 6-14.AP6 <br /> 20 Section 6-14, Geosynthetic Retaining Walls 111 <br /> 21 April 2, 2018 <br /> 22 6-14.2 Materials I <br /> 23 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 24 Cement Concrete" are revised to read: <br /> 25 <br /> 26 Cement 9-01 <br /> 27 Aggregates for Concrete 9-03.1 <br /> 28 <br /> 29 6-16.AP6 <br /> 30 Section 6-16, Soldier Pile and Soldier Pile Tieback Walls <br /> 31 April 2, 2018 1 <br /> 32 6-16.2 Materials <br /> 33 In the first paragraph, the reference to "Aggregates for Portland Cement Concrete" is revised <br /> 111 <br /> 34 to read: <br /> 35 <br /> 36 Aggregates for Concrete 9-03.1 <br /> 37 <br /> 38 6-18.AP6 <br /> 39 Section 6-18, Shotcrete Facing <br /> 40 January 2, 2018 <br /> 41 6-18.3(3) Testing <br /> 42 In the last sentence of the first paragraph, "AASHTO T 24" is revised to read "ASTM C1604", <br /> 43 <br /> 44 6-18.3(3)B Production Testing <br /> 45 In the last sentence, "AASHTO T 24" is revised to read "ASTM C1604". <br /> 46 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 25 OF 60 August 2018 I <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.