My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6-18.3(4) Qualifications of Contractor's Personnel <br /> 2 In the last sentence of the second paragraph, "AASHTO T 24" is revised to read "ASTM <br /> I3 01604". <br /> 4 <br /> 5 6-19.AP6 <br /> I 6 Section 6-19, Shafts <br /> 7 April 2, 2018 <br /> I 8 6-19.2 Materials <br /> 9 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 10 Cement Concrete" are revised to read: <br /> 11 <br /> 12 Cement 9-01 <br /> 13 Aggregates for Concrete 9-03.1 <br /> I 14 <br /> 15 6-19.3(3)C Conduct of Shaft Casing Installation and Removal and Shaft <br /> 16 Excavation Operations <br /> I 17 The first paragraph is supplemented with the following: <br /> 18 <br /> 19 In no case shall shaft excavation and casing placement extend below the bottom of <br /> I <br /> 20 shaft excavation as shown in the Plans. <br /> 21 <br /> 22 6-19.3(6)E Thermal Wire and Thermal Access Point (TAPS) <br /> 1 23 The third sentence of the third paragraph is revised to read: <br /> 24 <br /> 25 The thermal wire shall extend from the bottom of the reinforcement cage to the top of <br /> 26 the shaft, with a minimum of 5-feet of slack wire provided above the top of shaft. <br /> I 27 <br /> 28 The following new sentence is inserted after the third sentence of the third paragraph: <br /> 29 <br /> I 30 All thermal wires in a shaft shall be equal lengths. <br /> 31 <br /> 32 7-02.AP7 <br /> I 33 Section 7-02, Culverts <br /> 34 April 2, 2018 <br /> I 35 7-02.2 Materials <br /> 36 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 37 Cement Concrete" are revised to read: <br /> I 38 <br /> 39 Cement 9-01 <br /> 40 Aggregates for Concrete 9-03.1 <br /> I 41 <br /> 42 7-02.3(6)A4 Excavation and Bedding Preparation <br /> 43 The first sentence of the third paragraph is revised to read: <br /> 44 <br /> I <br /> 45 The bedding course shall be a 6-inch minimum thickness layer of culvert bedding <br /> 46 material, defined as granular material either conforming to Section 9-03.12(3) or to <br /> 47 AASHTO Grading No. 57 as specified in Section 9-03.1(4)0. <br /> I48 <br /> 1 WEST MARINE VIEW DRIVE UTILITIES PAGE 26 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> IWSDOT AMENDMENTS Rev 4/2/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.