Laserfiche WebLink
I <br /> 1 the field. The Working Drawing shall include, at a minimum, the following <br /> 2 information: <br /> I <br /> 3 <br /> 4 i. Plan sheet showing the proposed infiltration location and all surface <br /> 5 waters, wells, on-site sewage systems, aquifer-sensitive recharge <br /> 6 areas, sole source aquifers, and well-head protection areas within <br /> 7 150 feet. <br /> 8 <br /> 9 ii. The proposed elevation of soil surface receiving the wastewater for <br /> 10 infiltration and the anticipated phreatic surface (i.e., saturated soil). <br /> 11 <br /> 12 iii. The source of the water used to produce the slurry. I 13 <br /> 14 iv. The estimated total volume of wastewater to be infiltrated. <br /> 15 I 16 v. The accepted fioccuiant to be used (if any). <br /> 17 <br /> 18 vi. The controls or methods used to prevent surface wastewater runoff I <br /> 19 from leaving the infiltration location. <br /> 20 <br /> 21 vii. The strategy for removing slurry wastewater from the shaft and <br /> 22 containing the slurry wastewater once it has been removed from the <br /> I <br /> 23 shaft. <br /> 24 <br /> 25 viii. The strategy for monitoring infiltration activity and adapting methods <br /> I <br /> 26 to ensure compliance. <br /> 27 <br /> 28 ix. A contingency plan that can be implemented immediately if it <br /> I <br /> 29 becomes evident that the controls in place or methods being used are <br /> 30 not adequate. <br /> 31 I 32 x. The strategy for cleaning up the infiltration location after the infiltration <br /> 33 activity is done. Cleanup shall include stabilizing any loose sediment <br /> 34 on the surface within the infiltration area generated as a byproduct of <br /> I <br /> 35 suspended solids in the infiltrated wastewater or soil disturbance <br /> 36 associated with BMP placement and removal. <br /> 37 <br /> 38 2. Shaft drilling mineral slurry, synthetic slurry, or slurry with polymer additives <br /> I <br /> 39 not allowed for infiltration shall be contained and disposed of by the Contractor <br /> 40 at an accepted disposal facility in accordance with Section 2-03.3(7)C. Spoils <br /> 41 that have come into contact with mineral slurry shall be disposed of in I 42 accordance with Section 6-19.3(4)F. <br /> 43 <br /> 44 8-01.3(1)C4 Management of Off-Site Water <br /> 111 <br /> 45 This section is revised to read: <br /> 46 <br /> 47 Prior to clearing and grubbing, the Contractor shall intercept all sources of off-site I 48 surface water and overland flow that will run-on to the project. Off-site surface water <br /> 49 run-on shall be diverted through or around the project in a way that does not introduce <br /> 50 construction related pollution. It shall be diverted to its preconstruction discharge <br /> 51 location in a manner that does not increase preconstruction flow rate and velocity and <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 33 OF 60 August 2018 I <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br /> I <br />