Laserfiche WebLink
1 8-02.AP8 <br /> 2 Section 8-02, Roadside Restoration <br /> 3 January 2, 2018 <br /> 4 8-02.2 Materials <br /> 5 The reference to the material "Soil" is revised to read "Topsoil". <br /> 6 <br /> 7 8-02.5 Payment <br /> 8 The following new paragraph is inserted following the Bid item "Plant Selection ", per <br /> 9 each: <br /> 10 <br /> 11 The unit Contract price for "Plant Selection ", per each shall be full pay for all Work <br /> 12 to perform the work as specified within the planting area prior to planting for weed <br /> 13 control, planting area preparation and installation of plants with initial watering. <br /> 14 <br /> 15 The paragraph following the Bid item "PSIPE ", per each is revised to read: <br /> 16 <br /> 17 The unit Contract price for "PSIPE ", per each, shall be full pay for all Work to <br /> 18 perform the work as specified within the planting area for weed control and planting <br /> 19 area preparation, planting, cleanup, and water necessary to complete planting <br /> 20 operations as specified to the end of first year plant establishment. <br /> 21 <br /> 22 8-04.AP8 <br /> 23 Section 8-04, Curbs, Gutters, and Spillways <br /> 24 April 2, 2018 <br /> 25 8-04.2 Materials <br /> 26 In the first paragraph, the reference to "Portland Cement" is revised to read: ' <br /> 27 <br /> 28 Cement 9-01 <br /> 29 <br /> 30 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> 31 The first paragraph is supplemented with the following: <br /> 32 <br /> 33 Roundabout truck apron cement concrete curb and gutter shall be constructed with air <br /> 34 entrained concrete Class 4000 conforming to the requirements of Section 6-02. <br /> 35 <br /> 36 8-06.AP8 <br /> 37 Section 8-06, Cement Concrete Driveway Entrances <br /> 38 April 2, 2018 <br /> 39 8-06.2 Materials <br /> 40 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 41 <br /> 42 Cement 9-01 <br /> 43 <br /> 44 8-06.3 Construction Requirements <br /> 45 The first paragraph is revised to read: <br /> 46 <br /> 47 Cement concrete driveway approaches shall be constructed with air entrained concrete ' <br /> 48 Class 4000 conforming to the requirements of Section 6-02 or Portland Cement or <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 41 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />