My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-02.AP8 <br /> 2 Section 8-02, Roadside Restoration <br /> 3 January 2, 2018 <br /> 4 8-02.2 Materials <br /> 5 The reference to the material "Soil" is revised to read "Topsoil". <br /> 6 <br /> 7 8-02.5 Payment <br /> 8 The following new paragraph is inserted following the Bid item "Plant Selection ", per <br /> 9 each: <br /> 10 <br /> 11 The unit Contract price for "Plant Selection ", per each shall be full pay for all Work <br /> 12 to perform the work as specified within the planting area prior to planting for weed <br /> 13 control, planting area preparation and installation of plants with initial watering. <br /> 14 <br /> 15 The paragraph following the Bid item "PSIPE ", per each is revised to read: <br /> 16 <br /> 17 The unit Contract price for "PSIPE ", per each, shall be full pay for all Work to <br /> 18 perform the work as specified within the planting area for weed control and planting <br /> 19 area preparation, planting, cleanup, and water necessary to complete planting <br /> 20 operations as specified to the end of first year plant establishment. <br /> 21 <br /> 22 8-04.AP8 <br /> 23 Section 8-04, Curbs, Gutters, and Spillways <br /> 24 April 2, 2018 <br /> 25 8-04.2 Materials <br /> 26 In the first paragraph, the reference to "Portland Cement" is revised to read: ' <br /> 27 <br /> 28 Cement 9-01 <br /> 29 <br /> 30 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> 31 The first paragraph is supplemented with the following: <br /> 32 <br /> 33 Roundabout truck apron cement concrete curb and gutter shall be constructed with air <br /> 34 entrained concrete Class 4000 conforming to the requirements of Section 6-02. <br /> 35 <br /> 36 8-06.AP8 <br /> 37 Section 8-06, Cement Concrete Driveway Entrances <br /> 38 April 2, 2018 <br /> 39 8-06.2 Materials <br /> 40 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 41 <br /> 42 Cement 9-01 <br /> 43 <br /> 44 8-06.3 Construction Requirements <br /> 45 The first paragraph is revised to read: <br /> 46 <br /> 47 Cement concrete driveway approaches shall be constructed with air entrained concrete ' <br /> 48 Class 4000 conforming to the requirements of Section 6-02 or Portland Cement or <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 41 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.