Laserfiche WebLink
I1 control erosion and water pollution will be paid by force account in accordance with <br /> 2 Section 1-09.6. <br /> I 3 <br /> 4 To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> 5 amount in the Proposal to become a part of the Contractor's total Bid. <br /> I 6 <br /> 7 8-01.5(3) Reinstating Unit items with Lump Sum Erosion Control and Water <br /> 8 Pollution Prevention <br /> I 9 The Contract may establish the project as lump sum, in accordance with Section 8- <br /> 10 01.4(1) and also reinstate the measurement of one or more of the items described in <br /> 11 Section 8-01.4(2), except for Erosion/Water Pollution Control, by force account. When <br /> I 12 that occurs, the corresponding payment provision in Section 8-01.5(2) is not deleted <br /> 13 and the Work under that item will be paid as specified. <br /> 14 <br /> 15 8-01.5(4) Items not included with Lump Sum Erosion Control and Water Pollution <br /> I16 Prevention <br /> 17 Payment will be made for each of the following Bid items when they are included in the <br /> 18 Proposal: <br /> I 19 <br /> 20 "Compost Blanket", per square yard. <br /> 21 <br /> I <br /> 22 "Mulching", per acre <br /> 23 <br /> 24 "Mulching with PAM", per acre <br /> I 25 <br /> 26 "Mulching with Short-Term Mulch", per acre. <br /> 27 <br /> I 28 "Mulching with Moderate-Term Mulch", per acre. <br /> 29 <br /> 30 "Mulching with Long-Term Mulch", per acre. <br /> 31 <br /> I32 "Seeding, Fertilizing and Mulching", per acre. <br /> 33 <br /> 34 "Seeding and Fertilizing", per acre. <br /> I 35 <br /> 36 "Seeding and Fertilizing by Hand", per square yard. <br /> 37 <br /> I <br /> 38 "Second Application of Fertilizer", per acre. <br /> 39 <br /> 40 "Liming", per acre. <br /> I 41 <br /> 42 "Mowing", per acre. <br /> 43 <br /> I 44 "Seeding and Mulching", per acre. <br /> 45 <br /> 46 "High Visibility Fence", per linear foot. <br /> 1 47 <br /> 1 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 40 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> I <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />