My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1-05.18 Record Drawings 28 <br /> 1-06 CONTROL OF MATERIALS 30 <br /> 1-06.6 Recycled Materials 31 <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 32 <br /> 1-07.1 Laws to be Observed 32 t <br /> 1-07.2 State Taxes 33 <br /> 1-07.5 Environmental Regulations 34 <br /> 1-07.6 Permits And Licenses 35 <br /> 1-07.7 Load Limits 36 <br /> 1-07.9 Wages 36 <br /> 1-07.9(1) General 36 I 1-07.11 Requirements For Nondiscrimination 37 <br /> 1-07.12 Federal Agency Inspection 47 <br /> 1-07.16 Protection And Restoration Of Property 48 <br /> I <br /> 1-07.16(4)Archaeological and Historical Objects 48 <br /> 1-07.17 Utilities and Similar Facilities 48 <br /> 1-07.18 Public Liability and Property Damage Insurance 49 <br /> 1-07.23 Public Convenience and Safety 55 I 1-07.23(1) Construction Under Traffic 55 <br /> 1-07.24 Rights of Way 59 <br /> 1-08 PROSECUTION AND PROGRESS 60 <br /> 1-08.0 Preliminary Matters 60 <br /> 1-08.0(1) Preconstruction Conference 60 <br /> I <br /> 1-08.0(2) Hours of Work 60 <br /> 1-08.1 Subcontracting 61 <br /> 1-08.3 Progress Schedule 62 <br /> 1-08.4 Notice to Proceed and Prosecution of Work .62 <br /> 1-08.5 Time for Completion 63 111 <br /> 1-08.6 Suspension of Work 64 <br /> 1-08.9 Liquidated Damages 65 <br /> I <br /> 1-09 MEASUREMENT AND PAYMENT 65 <br /> 1-09.2(1) General Requirements for Weighing Equipment 65 <br /> 1-09.2(5) Measurement 65 <br /> 1-09.6 Force Account 66 <br /> 1-09.8 Payment For Material On Hand 66 <br /> 1-09.9 Payments 66 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 3 OF 117 August 2018 1 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> • <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.