Laserfiche WebLink
I <br /> 111 1-09.9 Retainage 67 <br /> I 1-09.11(3)Time Limitation and Jurisdiction 68 <br /> 1.10 TEMPORARY TRAFFIC CONTROL 68 <br /> 1-10.2 Traffic Control Management 68 <br /> I1-10.2(1) Removal of Defective and Unauthorized Work 69 <br /> 1-10.3 Traffic Control Labor, Procedures and Devices 69 <br /> I1-10.3(2)Traffic Control Procedures 69 <br /> 1-10.3(4)Traffic Control Labor 70 <br /> 11-10.3(5) Construction Signs 70 <br /> 1-10.4 Measurement 71 <br /> 1-10.4(2) Items with Lump Sum For Incidentals 71 <br /> 1 1-10.5 Payment 72 <br /> 1-10.5(2) Item Bids with Lump Sum for Incidentals 72 <br /> IDIVISION 2 73 <br /> EARTHWORK 73 <br /> I 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 73 <br /> 2-02.1 Description 73 <br /> 2-02.3 Construction Requirements 73 <br /> I2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures 74 <br /> 2-02.3(3) Removal of Existing Street Improvements 75 <br /> 1 2-02.3(4) Obliteration of Pavement Markings 76 <br /> 2-02.3(5)Abandon and Fill Pipe 76 <br /> I2-02.3(6) Sawing and Line Drilling 77 <br /> 2-02.3(7) Salvage 77 <br /> 1 2-02.3(8)Waste Disposal 77 <br /> 2-02.4 Measurement 77 <br /> 2-02.5 Payment 78 <br /> 1 2-03 ROADWAY EXCAVATION AND EMBANKMENT 79 <br /> 2-03.3(3) Excavation Below Subgrade 79 <br /> 1 2-03.3(7) Disposal of Surplus Material 79 <br /> 2-03.5 Payment 80 <br /> I 2-04 HAUL 80 <br /> 2-04.1 Description 80 <br /> 2-04.3 Construction Requirements 80 <br /> 1 2-04.4 Measurement 80 <br /> 2-04.5 Payment 80 <br /> IWEST MARINE VIEW DRIVE UTILITIES PAGE 4 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />