My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I5-06.3(1) General 89 <br /> 5-06.3(2) Cement Concrete Pavement Patch 89 <br /> I5-06.3(3) Cement Concrete Pavement Resurfaced with HMA 9n <br /> 5-06.3(4) HMA on Granular Base 90 <br /> 1 5-06.3(5) Untreated Roadway Surfaces 90 <br /> 5-06.3(6)Temporary Pavement Patching 91 <br /> I 5-06.3(7) Incidental Patching 91 <br /> DIVISION 7 91 <br /> I DRAINAGE STRUCTURES, STORM SEWERS, SANITARY 91 <br /> SEWERS, WATER MAINS, AND CONDUITS 91 <br /> 7-04 STORM SEWERS 91 <br /> I7-04.2 Materials 91 <br /> 7-04.4 Payment 92 <br /> 1 7-04.5 Payment 92 <br /> 7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS 92 <br /> I 7-05.3 Construction Requirements 92 <br /> 7-05.3(1)Adjusting Manholes and Catch Basins to Grade 92 <br /> 7-05.3(3) Connections to Existing Manholes 93 <br /> 1 7-05.3(4) Drop Manhole Connections 94 <br /> 7-05.3(5) Furnish and Install Solid Lid for Catch Basins 94 <br /> I7-05.3(6) Pressure Manhole 94 <br /> 7-05.4 Measurement 95 <br /> I 7-05.5 Payment 95 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 95 <br /> 7-08.2 Materials 95 <br /> I7-08.3 Construction Requirements 96 <br /> 7-08.3(2) Laying Pipe 96 <br /> 1 7-08.3(3) Backfilling 96 <br /> 7-08.3(4) Plugging Existing Pipe 97 <br /> I7-08.3(5)Submittals 97 <br /> 7-08.4 Measurement 97 <br /> I 7-08.5 Payment 98 <br /> 7-17 SANITARY SEWERS 99 <br /> 7-17.1 Description 99 <br /> 1 7-17.2 Materials 99 <br /> 7-17.3 Construction Requirements 99 <br /> IWEST MARINE VIEW DRIVE UTILITIES PAGE 6 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.