Laserfiche WebLink
1 <br /> 2-07 WATERING 80 I <br /> 2-07.3 Construction Requirements 80 <br /> 2-07.R Street (:leaning 81 <br /> 2-07.8(1) Description 81 <br /> 2-07.8(2) Construction Requirements 81 <br /> II <br /> 2-07.8(3) Measurement 81 <br /> 2-07.8(4) Payment 82 <br /> 111 <br /> 2-09 STRUCTURE EXCAVATION 82 <br /> 2-09.3 Construction Requirements 82 <br /> 2-09.4 Measurement 82 <br /> 2-09.5 Payment 82 <br /> 2-11 TRIMMING AND CLEANUP 83 <br /> 2-11.1 Description 83 <br /> 2-11.3 Construction Requirements 8311 <br /> 2-13 TRIAXIAL GEOGRID 84 <br /> 2-13.1 Description 84 <br /> 2-13.1(1) References 84 <br /> 2-13.1(2) Definitions 85 I 2-13.2 Materials 85 <br /> 2-13.3Constr'uction Requirements 87 <br /> 2-13.3(1) Submittals 87 <br /> I <br /> 2-13.3(2) Quality Assurance 87 <br /> 2-13.3(3) Delivery, Storage, and Handling 87 <br /> 2-13.3(4) Installation 87 <br /> 2-13.3(5) Granular Fill Placement over Geogrid 88 <br /> 2-13.3(6) Inspection 88 <br /> 2-13.3(7) Repair 88 <br /> 2-13.3(8) Protection 88 <br /> 2-13.4 Measurement 88 <br /> 2-13.5 Payment 88 <br /> DIVISION 5 88 <br /> SURFACE TREATMENTS AND PAVEMENTS 88 <br /> 5-06 PAVEMENT PATCH 88 <br /> 5-06.1 Description 89 <br /> 5-06.2 Materials 89 <br /> 5-06.3 Construction Requirements 89 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 5 OF 117 August 2018 1 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />