Laserfiche WebLink
I <br /> 1 8-22.3 Construction Requirements 112 <br /> 8-22.4 Measurement 112 <br /> 1 8-22.5 Payment 112 <br /> DIVISION 9 112 <br /> IMATERIALS 112 <br /> 9-03 AGGREGATES 112 <br /> I 9-03.14 Borrow 112 <br /> 9-03.14(1) Gravel Borrow 112 <br /> I 9-03.22 Non-Shrink Cement Sand Grout 113 <br /> 9-05 DRAINAGE STRUCTURES, CULVERTS AND CONDUITS 113 <br /> 9-05.15 Metal Castings 113 <br /> 1 9-05.15(1) Manhole Ring and Cover 113 <br /> 9-05.23 High-Density Polyethelene (HDPE) Pipe 114 <br /> I 9-13 RIPRAP, QUARRY SPALLS, SLOPE PROTECTION, AND ROCK FOR EROSION AND <br /> SCOUR PROTECTION AND ROCK WALLS 114 <br /> 9-13.8 Quarry Rock 114 <br /> II9-29 ILLUMINATION, SIGNAL, ELECTRIC 115 <br /> 9-29.2 Junction Boxes, Cable Vaults, and Pull Boxes 115 <br /> 1 9-29.2(4) Cover Markings 115 <br /> 9-30 WATER DISTRIBUTION MATERIALS 116 <br /> I 9-30.1 Pipe 116 <br /> 9-30.1(1) Ductile Iron Pipe 116 <br /> 9-I <br /> 30.1(5) Polyvinyl Chloride (PVC) 116 <br /> 9-30.2 Fittings 117 <br /> 9-30.3 Valves 117 <br /> 1 9-30.3(2) Plug Valve 117 <br /> I <br /> I <br /> I <br /> I <br /> IWEST MARINE VIEW DRIVE UTILITIES PAGE 8 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />