Laserfiche WebLink
1 <br /> 1 INTRODUCTION TO THE SPECIAL PROVISIONS <br /> 2 <br /> 3 (August 14, 2013 APWA GSP) 1 <br /> 4 <br /> 5 The work on this project shall be accomplished in accordance with the Standard Specifications <br /> 6 for Road, Bridge and Municipal Construction, 2018 edition, as issued by the Washington State <br /> 7 Department of Transportation (WSDOT) and the American Public Works Association (APWA), 111 <br /> 8 Washington State Chapter (hereafter "Standard Specifications"). The Standard Specifications, <br /> 9 as modified or supplemented by the Amendments to the Standard Specifications and these <br /> 10 Special Provisions, all of which are made a part of the Contract Documents, shall govern all of <br /> 11 the Work. <br /> 12 <br /> 13 These Special Provisions are made up of both General Special Provisions (GSPs) from various 111 <br /> 14 sources, which may have project-specific fill-ins; and project-specific Special Provisions. Each <br /> 15 Provision either supplements, modifies, or replaces the comparable Standard Specification, or is <br /> 16 a new Provision. The deletion, amendment, alteration, or addition to any subsection or portion of <br /> 17 the Standard Specifications is meant to pertain only to that particular portion of the section, and <br /> 18 in no way should it be interpreted that the balance of the section does not apply. <br /> 19 <br /> 20 The project-specific Special Provisions are not labeled as such. The GSPs are labeled under the <br /> 21 headers of each GSP, with the effective date of the GSP and its source. For example: <br /> 22 <br /> 23 (March 8, 2013 APWA GSP) <br /> 24 (April 1, 2013 WSDOT GSP) <br /> 25 (May 1, 2013 City of Everett GSP) <br /> 26 <br /> 27 Also incorporated into the Contract Documents by reference are: <br /> 28 • Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted <br /> 29 edition, with Washington State modifications, if any <br /> 30 • Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current <br /> 31 edition <br /> 32 • City of Everett Design and Construction Standards and Specifications, City of Everett, <br /> 33 current Edition <br /> 34 <br /> 35 Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> 36 <br /> 37 <br /> 1 <br /> I <br /> 1 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 9 OF 117 August 2018 111 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />