My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Contract Provisions 8 Furnished automatically <br /> upon award. I <br /> Large plans (e.g., 22" x 4 Furnished only upon <br /> 34") request. <br /> 1 <br /> 2 Additional plans and Contract Provisions may be obtained by the Contractor from the source <br /> 3 stated in the Call for Bids, at the Contractor's own expense. <br /> 4 <br /> 5 <br /> 6 1-02.4 Examination of Plans, Specifications and Site of Work I <br /> 7 <br /> 8 1-02.4(1) General <br /> 9 <br /> 10 1-02.4(2) Subsurface Information <br /> 11 (March 8, 2013 APWA GSP) <br /> 12 The second sentence in the first paragraph is revised to read: I <br /> 13 <br /> 14 The Summary of Geotechnical Conditions and the boring logs, if and when included as <br /> 15 an appendix to the Special Provisions, shall be considered as part of the Contract. <br /> 16 <br /> 17 <br /> 18 1-02.6 Preparation of Proposal <br /> 111 <br /> 19 (May 17, 2018 APWA GSP) <br /> 20 <br /> 21 Supplement the second paragraph with the following: <br /> 22 4. If a minimum bid amount has been established for any item, the unit or lump sum price <br /> 23 must equal or exceed the minimum amount stated. <br /> 24 5. Any correction to a bid made by interlineation, alteration, or erasure, shall be initialed , <br /> 25 by the signer of the bid. <br /> 26 ,27 Delete the last two paragraphs, and replace them with the following: <br /> 28 <br /> 29 If no Subcontractor is listed, the Bidder acknowledges that it does intend to use any <br /> 30 Subcontractor to perform those items of work. I <br /> 31 <br /> 32 The Bidder shall submit with their Bid a completed Contractor Certification Wage Law <br /> 33 Compliance form, provided by the Contracting Agency. Failure to return this certification as <br /> 34 part of the Bid Proposal package will make this Bid Nonresponsive and ineligible for Award. <br /> 35 A Contractor Certification of Wage Law Compliance form is included in the Proposal Forms. <br /> 36 '37 The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. <br /> 38 <br /> 39 A bid by a corporation shall be executed in the corporate name, by the president or a vice <br /> 40 president (or other corporate officer accompanied by evidence of authority to sign). <br /> 41 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 13 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.