Laserfiche WebLink
I <br /> 1 Contract Documents <br /> 2 See definition for "Contract". <br /> 111 3 <br /> 4 Contract Time <br /> 5 The period of time established by the terms and conditions of the Contract within which the <br /> I 6 Work must be physically completed. <br /> 7 <br /> 8 Notice of Award <br /> 9 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> I 10 Contracting Agency's acceptance of the Bid Proposal. <br /> 11 <br /> 12 Notice to Proceed <br /> I13 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> 14 and directing the Contractor to proceed with the Work and establishing the date on which <br /> 15 the Contract time begins. <br /> 16 <br /> 17 Traffic <br /> 18 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> I19 equestrian traffic. <br /> 20 <br /> 21 1-02 BID PROCEDURES AND CONDITIONS <br /> 22 <br /> 23 1-02.1 Prequalification of Bidders <br /> 24 <br /> I25 Delete this section and replace it with the following: <br /> 26 <br /> 27 1-02.1 Qualifications of Bidder <br /> 28 (January 24, 2011 APWA GSP) <br /> I29 <br /> 30 Before award of a public works contract, a bidder must meet at least the minimum <br /> 31 qualifications of RCW 39.04.350(1)to be considered a responsible bidder and qualified to be <br /> I32 awarded a public works project. <br /> 33 <br /> 34 <br /> I35 1-02.2 Plans and Specifications <br /> 36 (June 27, 2011 APWA GSP) <br /> 37 <br /> I38 Delete this section and replace it with the following: <br /> 39 <br /> 40 Information as to where Bid Documents can be obtained or reviewed can be found in the <br /> I41 Call for Bids (Advertisement for Bids)for the work. <br /> 42 <br /> 43 After award of the contract, plans and specifications will be issued to the Contractor at no <br /> 44 cost as detailed below: <br /> 45 <br /> To Prime Contractor No. of Sets Basis of Distribution <br /> Reduced plans (11" x 17") 8 Furnished automatically <br /> I upon award. <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 12 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />