Laserfiche WebLink
PROJECT OVERVIEW <br /> This project proposes to install 1300 feet of storm sewer to convey storm water runoff from the <br /> Everett Community College east parking lots to the 42 inch combined sewer main crossing <br /> Waverly Avenue. The existing storm drain system conpection to the 8 inch combined sewer in <br /> Broadway Avenue will be cut,capped and abandoned. Additionally,frontage improvements will <br /> be added along the westerly edge of Broadway Ave-and the southerly edge of Tower Street. <br /> EVERETT COMMUNITY COLLEGE <br /> STORM DRAINAGE IMPROVEIVIENTS <br /> VICINITY MAP <br /> „ _ ,_,_,..„,„4,,,, ,,,_‘,1 <br /> —,.. — A \ 111 <br /> i <br /> - - -RESTON ':,-,. - "t--;;',,,ir,'1:72-4-...„.- 44,4 \ <br /> POINT \ <br /> . ...I ,91,.. ... w \ <br /> ..., 1p <br /> . ,. . <br /> , <br /> — AMERICAN LEGION ,k•ik sr , <br /> MEMORIAL PARK <br /> ,,, <br /> 3.6 4 <br /> tt <br /> I <br /> stik <br /> I <br /> OEM ,„, ,A1. •••:. li., --;_ PROJECT <br /> SITE <br /> -jbj -,7 .11111111ivaLsi N <br /> k it <br /> 0,- <br /> ts1V ..12 . <br /> 121 i _ <br /> .i <br /> v / . <br /> 11 1 I silk e. , <br /> ..., <br /> , , k <br /> ':• 1 ,g <br /> MIN AililliPlb!. Iti, j <br /> ic-N <br /> Everett Community College February 8,2001_Reid iddleton <br /> Stormwater Hydraulics Report <br />