My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 N BROADWAY EVCC 2018-01-01 MF Import
>
Address Records
>
N BROADWAY
>
1010
>
EVCC
>
1010 N BROADWAY EVCC 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2018 8:55:30 AM
Creation date
12/4/2018 8:55:07 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1010
Tenant Name
EVCC
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CURRENT CONDITIONS SUMMARY <br /> The existing storm drainage from the east Everett Community College parking lots adjacent to <br /> Broadway Ave.and 10th Street is discharged to the existing 8 inch combined sewer main in <br /> Broadway Ave(See Current Condition Map). The 8 inch combined sewer main runs north along <br /> Broadway Ave.and connects to the 42 inch combined sewer trunk main in the golf course north <br /> of the college. Drainage from the roof of the Instructional Technology Center(ITC)and 1.3 <br /> acres of surrounding area discharges to the 8 inch combined sewer main at the north end of <br /> Broadway Ave.at Tower St. During an intense storm in 1998 it was reported that excessive <br /> runoff caused a surcharge in the combined sewer system which flooded basements on the east <br /> side of Broadway Ave.between 10th St.and Tower St. <br /> PROPOSED IMPORVEMENTS SUMMARY <br /> To alleviate future capacity problems in the existing 8 inch combined sewer main,a storm drain <br /> system will connect to the Everett Community College east parking lots. The system will run <br /> north along the west side of Broadway Ave.within the landscape area between the sidewalk and <br /> parking lots and intercept the surface flows from the parking lots and ITC area(See Proposed <br /> Improvements Map). The connections to the existing 8 inch combined sewer will be cut,capped <br /> and abandoned_ The proposed line will run east down the north edge of Tower St.and then turn <br /> north on Waverly Ave. and tie into an existing manhole on the 42"combined sewer trunk main. <br /> (See Storm Drainage Plans,. _ pendix B) At this time no additional drainage will be picked up <br /> along Tower St.or Waverly Ave.although the line will be sized to accommodate future <br /> expansion of the college campus east of Broadway(See Assumed Future Expansion Map). <br /> The sidewalk on the west side of Broadway Ave. will be extended to meet the sidewalk along the <br /> north side of Tower St. Additional sidewalk will be constructed along the south side of Tower <br /> St.at Broadway. <br /> Everett Community College February 8,2001 <br /> Stormwater Hydraulics Report -2 <br /> Reid iddletnn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.