CURRENT CONDITIONS SUMMARY <br /> The existing storm drainage from the east Everett Community College parking lots adjacent to <br /> Broadway Ave.and 10th Street is discharged to the existing 8 inch combined sewer main in <br /> Broadway Ave(See Current Condition Map). The 8 inch combined sewer main runs north along <br /> Broadway Ave.and connects to the 42 inch combined sewer trunk main in the golf course north <br /> of the college. Drainage from the roof of the Instructional Technology Center(ITC)and 1.3 <br /> acres of surrounding area discharges to the 8 inch combined sewer main at the north end of <br /> Broadway Ave.at Tower St. During an intense storm in 1998 it was reported that excessive <br /> runoff caused a surcharge in the combined sewer system which flooded basements on the east <br /> side of Broadway Ave.between 10th St.and Tower St. <br /> PROPOSED IMPORVEMENTS SUMMARY <br /> To alleviate future capacity problems in the existing 8 inch combined sewer main,a storm drain <br /> system will connect to the Everett Community College east parking lots. The system will run <br /> north along the west side of Broadway Ave.within the landscape area between the sidewalk and <br /> parking lots and intercept the surface flows from the parking lots and ITC area(See Proposed <br /> Improvements Map). The connections to the existing 8 inch combined sewer will be cut,capped <br /> and abandoned_ The proposed line will run east down the north edge of Tower St.and then turn <br /> north on Waverly Ave. and tie into an existing manhole on the 42"combined sewer trunk main. <br /> (See Storm Drainage Plans,. _ pendix B) At this time no additional drainage will be picked up <br /> along Tower St.or Waverly Ave.although the line will be sized to accommodate future <br /> expansion of the college campus east of Broadway(See Assumed Future Expansion Map). <br /> The sidewalk on the west side of Broadway Ave. will be extended to meet the sidewalk along the <br /> north side of Tower St. Additional sidewalk will be constructed along the south side of Tower <br /> St.at Broadway. <br /> Everett Community College February 8,2001 <br /> Stormwater Hydraulics Report -2 <br /> Reid iddletnn. <br />