My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 N BROADWAY EVCC 2018-01-01 MF Import
>
Address Records
>
N BROADWAY
>
1010
>
EVCC
>
1010 N BROADWAY EVCC 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2018 8:55:30 AM
Creation date
12/4/2018 8:55:07 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1010
Tenant Name
EVCC
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED LIBERTY HALL,EVERETT COMMUNITY COLLEGE^-- Everett,Washington <br /> flattened. However, temporary cuts should be discussed with the geotechnical engineer during <br /> final design development to evaluate suitable cut slope inclinations for the various portions of the <br /> excavation. <br /> The above guidelines assume that surface loads such as traffic, construction equipment, <br /> stockpiles or building supplies will be kept away from the top of the cut slopes a sufficient distance <br /> so that the stability of the excavation is not affected. We recommend that this distance be at least <br /> 5 feet from the top of the cut for temporary cuts made at 1.5H:1V or flatter. <br /> Temporary cut slopes should be planned such that they do not encroach on a 1H:1V influence line <br /> projected down from the edges of nearby or planned foundation elements. <br /> Water entering excavations must be collected and routed away from prepared subgrade areas. We <br /> expect that this may be accomplished by installing a system of drainage ditches and sumps along <br /> the toe of the cut slopes. Some sloughing and raveling of the cut slopes should be expected. <br /> Temporary covering, such as heavy plastic sheeting with appropriate ballast, should be used to <br /> protect these slopes during periods of wet weather. Surface water runoff from above cut slopes <br /> should be prevented from flowing over the slope face by using berms, drainage ditches, swales or <br /> other appropriate methods. <br /> If temporary cut slopes experience excessive sloughing or raveling during construction, it may <br /> become necessary to modify the cut slopes to maintain safe working conditions. Slopes <br /> experiencing problems can be flattened,regraded to add intermediate slope benches,or additional <br /> dewatering can be provided if the poor slope performance is related to groundwater seepage. <br /> Foundation Support <br /> • <br /> The site contains variable ground conditions that include fill and compressible silt/clay soils. <br /> These soils may induce settlement under building loads under certain conditions. Static loads from <br /> the building will compress and subsequently induce settlement of the native silt/clay soils and the <br /> looser fill soils. Settlements in the native silt/clay soils are a significant concern at the site. Based <br /> on the proposed building layout and finished floor of Elevation 84 feet,dense glacially consolidated <br /> soils will underlay the west end of the building and up to 12 feet of compressible native silt/clay <br /> and fill soils underlay the east end of the building. Due to the variable ground conditions under the <br /> building,the building footprint is divided into four zones as shown in Figure 3. We estimate that up <br /> to 4 inches of settlement may occur where heavily-loaded column footings are located over these <br /> compressible silt/clay soils, if not properly mitigated. To mitigate potentially damaging settlement <br /> we recommend that the building foundations be supported either on a pad of imported structural <br /> fill, aggregate piers, small diameter pipe piles, or a combination of these systems as described <br /> below. <br /> Shallow Foundations <br /> Shallow Foundation Design <br /> We anticipate that it will be most economical to support the building on conventional spread <br /> footings supported on (1)dense to very dense native glacially consolidated soils within Zone 1, and <br /> (2) a structural fill pad following partial overexcavation and removal of compressible silt/clay <br /> GEOENGINEERLO June 10,2010 Page 11 <br /> File No.5836-010-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.