Laserfiche WebLink
The items for maintenance consideration are as follows: <br /> Temporary Construction Erosion/Sedimentation Control BMPs <br /> 1. Filter Fabric Fence <br /> 2. Temporary Construction Entrance <br /> 3. Construction Fencing <br /> 4. Temporary Sediment Trap <br /> 5. Catch Basin Inlet Protection <br /> 6. Cover Measures <br /> 7. Dust Control <br /> Permanent Stormwater Facilities, Grounds Maintenance, and Pest Control <br /> 1. Storm Drainage Pipes <br /> 2. Catch Basins <br /> 3. Parking Lot Cleaning <br /> • 4. Vegetation Management <br /> 5. Pest Control <br /> See Appendix D for Maintenance Guidelines. <br /> 10.0 CONCLUSION <br /> This analysis is based on data and records either supplied to or obtained by AHBL, Inc. These <br /> documents are referenced within the text of the analysis. The analysis has been prepared <br /> utilizing procedures and practices within the standard accepted practices of the industry. We <br /> conclude that this project, as proposed, will not create any new problems within the existing <br /> downstream drainage system. <br /> AHBL, Inc. <br /> Craig Schoenberg, <br /> Project Engineer <br /> CSS/Isk <br /> March 2011 <br /> Q•\2009\209459\WORDPROC\Reports\20110302_Rpt_(SWSP_Index)_209459.10.11-wp.docx <br /> Stormwater-Site Plan..Report <br /> Everett Community College 01300 <br /> Index Hall Replacement&Surface Parking Lot"M" 11 <br /> 209459.10/209459.11 <br />