Laserfiche WebLink
PLATT <br /> Distribution Equipment Quotation <br /> Item Qty Product ` Description . .. <br /> 1 CT AND METER LUG LANDING <br /> Catalog No 6067HEEL <br /> Qty List of Materials <br /> 1 LUG LANDING <br /> LOT NET 5,505.00 <br /> panelboards: 4 - 6 weeks <br /> Metering Equipment: stock - 1 day <br /> Fuses: stock - 1 day <br /> Discos: 1 week <br /> Enclosed Breakers: 2 - 3 weeks <br /> NOTE# <br /> 1. Seismic Qualification:Eaton will supply"Seismic Qualified"certificates,mounting provision locations,center of gravity, <br /> weights,and installation recommendations. (These items can also be found at www.eaton.com/seismic) The CONTRACTOR <br /> will be responsible for all costs associated with the equipment anchorage details-coordinated with the Eaton supplied mounting <br /> provision locations,center of gravity,weights,and installation recommendations-prepared and stamped by a licensed civil <br /> engineer. <br /> Quote is valid for this bill of material only,no other items or services provided except as noted herein. <br /> Quote is valid for 30 days from date of quote. <br /> Manufacturers standard lead times apply:panelboards 4-6 weeks,switchboards 10-12 weeks,dry transformers stock to 2 weeks,oil <br /> filled,substation,and 5/15Kv equipment 12-24 weeks.Prices in effect at time of shipments. Quote does not include any 3rd party <br /> services except as noted <br /> Submittals and O&M's will be provided in PDF format at no charge. Hard copies(printed)will be charged at the additional cost of <br /> printing and materials. <br /> Contractor is responsible for obtaining correct measurements on jobsite and determining correct fit for quoted items. <br /> Payment terms are net 30 days.Platt Electric's standard terms and conditions of sale apply.For complete details go to: <br /> http//www.platt.com/service/terms.com. <br /> Standard motor freight in the lower 48 states is prepaid and allowed FOB factory except as nOted within this bill of material. <br /> Thank You <br />