My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 10/11/2018 Change Order 5
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 10/11/2018 Change Order 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 8:41:29 AM
Creation date
12/5/2018 8:41:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
10/11/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
5
Tracking Number
0000801
Total Compensation
$15,477.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLATT <br /> Distribution Equipment Quotation <br /> Item Qty • Product : Description <br /> 1 CT AND METER LUG LANDING <br /> Catalog No 6067HEEL <br /> Qty List of Materials <br /> 1 LUG LANDING <br /> LOT NET $ 7,350.00 <br /> Panelboards: 4 - 6 weeks <br /> Metering Equipment: 1 week <br /> Fuses: 'l week <br /> Safety Switches: I - 2 weeks <br /> Enclosed Breakers: 2 - 3 weeks <br /> Elevator Cntrl Switch: 4 - 6 weeks <br /> NOTE# <br /> 1. Seismic Qualification:Eaton will supply"Seismic Qualified"certificates,mounting provision locations,center of gravity, <br /> weights,and installation recommendations. (These items can also be found at www.eaton.com/seismic) The CONTRACTOR <br /> will be responsible for all costs associated with the equipment anchorage details-coordinated with the Eaton supplied mounting <br /> provision locations,center of gravity,weights,and installation recommendations-prepared and stamped by a licensed civil <br /> engineer. <br /> Quote is valid for this bill of material only,no other items or services provided except as noted herein. <br /> Quote is valid for 30 days from date of quote. <br /> Manufacturers standard lead times apply:panelboards 4-6 weeks,switchboards 10-12 weeks,dry transformers stock to 2 weeks, oil <br /> filled,substation, and 5/1511v equipment 12-24 weeks.Prices in effect at time of shipments. Quote does not include any 3'dparty <br /> services except as noted. <br /> Submittals and O&M's will be provided in PDF format at no charge.Hard copies(printed)will be charged at the additional cost of <br /> printing and materials. <br /> Contractor is responsible for obtaining correct measurements on jobsite and determining correctft for quoted items. <br /> Payment terms are net 30 days. Platt Electric's standard terms and conditions of sale apply.For complete details go to: <br /> hup/Iwww.platt.com/servicelterms.com. <br /> Standard motor freight in the lower 48 states is prepaid and allowed FOB factory except as noted within this bill of material. <br /> Thank You <br />
The URL can be used to link to this page
Your browser does not support the video tag.