Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 5 <br /> Change Order Effective Date: 9-25-2018 <br /> CONTRACTOR <br /> By G_.Cc:2/c Date: 9/ZS/Zo / f3 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> FIRE DETECTION SYSTEM-The elevator shaft and elevator control room requires a fire detection <br /> system. This was not included in the original contract documents. <br /> Exhibit B—Additional Contract Time: <br /> No additional contract working days are associated with the change. <br /> Exhibit C—Existing and New Bid Item(s) <br /> NEW Bid Item B100 -Fire Detection System West Tower, 1 LS for$15,477.91 <br /> Measurement and Payment <br /> Measurement and Payment shall be lump sum and include all labor, materials and equipment to install <br /> the fire detection system which meets the approval of the City of Everett Fire Marshall. <br /> ATTACHMENT ONE FOLLOWS(Additional Page) <br /> • Interest Construction change proposal 13, dated 9/25/18 <br /> Page 3 of 3 <br />