My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 10/11/2018 Change Order 5
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 10/11/2018 Change Order 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 8:41:29 AM
Creation date
12/5/2018 8:41:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
10/11/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
5
Tracking Number
0000801
Total Compensation
$15,477.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 5 <br /> Change Order Effective Date: 9-25-2018 <br /> CONTRACTOR <br /> By G_.Cc:2/c Date: 9/ZS/Zo / f3 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> FIRE DETECTION SYSTEM-The elevator shaft and elevator control room requires a fire detection <br /> system. This was not included in the original contract documents. <br /> Exhibit B—Additional Contract Time: <br /> No additional contract working days are associated with the change. <br /> Exhibit C—Existing and New Bid Item(s) <br /> NEW Bid Item B100 -Fire Detection System West Tower, 1 LS for$15,477.91 <br /> Measurement and Payment <br /> Measurement and Payment shall be lump sum and include all labor, materials and equipment to install <br /> the fire detection system which meets the approval of the City of Everett Fire Marshall. <br /> ATTACHMENT ONE FOLLOWS(Additional Page) <br /> • Interest Construction change proposal 13, dated 9/25/18 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.