My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 10/11/2018 Change Order 5
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 10/11/2018 Change Order 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 8:41:29 AM
Creation date
12/5/2018 8:41:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
10/11/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
5
Tracking Number
0000801
Total Compensation
$15,477.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> September 25th,2018 COP 013 <br /> Ken Kettel,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett, WA 98201 <br /> RE: COP 013: RFP 03—Fire Detection System <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) is providing this Change Order Proposal (COP) as <br /> requested per RFP 03 to supply a fire detection system for the west abutment tower. <br /> Interwest proposes to provide additional labor, equipment, and materials as detailed below to <br /> address the added work requested: <br /> • Supply and install a complete fire detection system as detailed in the enclosed proposal <br /> from Western States Fire Protection <br /> • Electrical system modifications to support the fire detection system including an upsized <br /> panel and shunt trip device <br /> Interwest's proposed price includes the following clarifications: <br /> • This proposal is provided subject to the clarifications provided by Western States Fire <br /> Protection <br /> • Ongoing maintenance or subscription fees are not included unless explicitly noted <br /> • Sales tax has been included on materials <br /> Interwest proposes the following Pricing for these changed conditions: <br /> • Supply/Install Fire Detection System $ 15,477.91 Lump Sum <br /> • TOTAL $ 15,477.91 Lump Sum <br /> Interwest requests 0 additional Contract Days work to perform this work. <br /> Please do not hesitate to contact me if you wish to discuss this matter. <br /> Respectfully, <br /> INTERWEST CONSTRUCTION, INC. <br /> Izaak Fox,P.E. <br /> Project Manager <br /> Cc: Project File <br /> Enclosure: Cost Detail including Western States Proposal and Electric West COP 04 <br /> RFP 03 <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI 12 I OF <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.