Laserfiche WebLink
illrik171=A PUBLIC WORKS <br /> Mehrdad Moini,P.E. <br /> December 19, 2017 <br /> Page 3 of 3 <br /> The City of Everett believes that in order to complete this project, a waiver must be granted,as there <br /> are no viable options for obtaining and ultimately constructing an elevator using 100%American <br /> made and produced steel and iron. Due to the fact that elevator manufacturers rely on a multitude of <br /> suppliers or sources to construct an elevator of the type required in the project specifications, we <br /> hthe Cityof Everett begranted a waiver of the BuyAmerica requirements for the elevator <br /> request that <br /> q <br /> system. <br /> If you have any questions or concerns, don't hesitate to contact me. Thank you. <br /> Sincerely, <br /> / <br /> David H. Davis,P.E. <br /> Public Works Director <br /> City of Everett <br /> Cc: Keith Alewine,Assistant Construction Manager; Heather Griffin,P.E.,Principal Engineer; Jim Miller, <br /> P.E., Engineering Superintendent; Shaun Bridge, Project Coordinator;Richard Tarry,Engineering <br /> Services Manager; Ryan Sass,P.E., City Engineer <br /> PUBLIC WORKS • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />