Laserfiche WebLink
3. The antennas shall be flush mounted to the existing pole as shown on the photo <br />simulations on file with the City and included as exhibit �t6 in the staff report. <br />4. This fand use permit shall terminate if the Appficant does not apply for a building <br />permi! within 18 months (or, with an extension, 24 months), except where a time <br />limit U�� the land use permit is otherwise established under federal or state law, <br />city orhinance, or an executed developmenf agreement. <br />Done and dated this 3rd day of May, 2005. <br />1�Jl7 �. ��� <br />Jame . Driscoll <br />Hearing Examiner <br />