My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WRK Engineers 12/7/2018
>
Contracts
>
6 Years Then Destroy
>
2021
>
WRK Engineers 12/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 11:05:06 AM
Creation date
12/18/2018 11:04:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WRK Engineers
Approval Date
12/7/2018
Council Approval Date
11/21/2018
End Date
12/31/2021
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Service Center Seismic Strengthening
Tracking Number
0001545
Total Compensation
$505,950.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOVERY:An estimate of the MINIMUM timeframe to carry nut sufficient repairs and to remove-naior safety hazards and <br /> obstacles to regain occupancy and use of the building.but not necessarily restore it to its full intended functions. <br /> * * * * * Immediately to days:The expected performance will likely result in people being able to quickly re-enter arid <br /> resume use of the building from immediately to a few days,excluding external factors. <br /> * * * * Within days to weeks:The expected performance may result in delay of minimum operational use for days to <br /> weeks,excluding external factors. <br /> * * * Within weeks to months:The expected performance may result in delay of minimum operational use for weeks to <br /> months,excluding external factors. <br /> * * Within months to a year:Expected performance may result in delay of minimum operational use for months to <br /> a year. <br /> •* More than one year:Expected performance may result in delay of minimum operational use for at least one year <br /> or more. <br /> SAFETY:The potential for people in the building to get out after a disaster and avoid bodily injuries or loss of life.A safety <br /> rating is required in all building evaluations. <br /> * * * * r` injuries and blocking of exit paths unlikely:Expected performance results in conditions unlikely to cause injuries <br /> or to keep people from exiting the building. <br /> * * * * Serious injuries unlikely:Expected performance results in conditions that are unlikely to cause serious injuries. <br /> * * * Loss of life unlikely:Expected performance results in conditions that are unlikely to cause loss of life. <br /> * * Loss of life possible in isolated locations:Expected performance results in conditions associated with partial <br /> collapse or falling objects,which have a potential to cause loss of life at some locations within or around the building. <br /> * Loss of life likely in the building:Expected performance results in conditions associated with building collapse, <br /> which has a high potential to cause death within or around the building. <br /> DAMAGE:Repair cost as a percentage of the building's overall replacement cost including structural,architectural,mechanical, <br /> electrical and plumbing systems.It does not include damage caused by breaks/leaks in water and gas pipes or contents damage. <br /> * * * * * Minimal damage:Repair Cost likely less than 5%of building replacement cost. <br /> * * * * Moderate damage:Repair Cost likely less than 10%of building replacement cost. <br /> • <br /> * * * Significant damage:Repair Cost tikety less than 20%of building replacement cost. <br /> * * Substantial damage:Repair Cost likely less than 40%of building replacement cost. <br /> Severe damage:Repair Cost likely greater than 40%of building replacement cost. <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.