My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3105 PINE ST HOLIDAY INN 2018-01-01 MF Import
>
Address Records
>
PINE ST
>
3105
>
HOLIDAY INN
>
3105 PINE ST HOLIDAY INN 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 11:35:19 AM
Creation date
12/20/2018 11:30:40 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3105
Tenant Name
HOLIDAY INN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ( r . Everett <br /> G� PUBL/C N/ORKS � <br /> -' ENGINEER/NG/PUBLIC SERV/CES DEPAI4TMENT I I I I' <br /> 2002 <br /> February 14, 2005 <br /> Jeffrey S. Degen, AIA <br /> Degen & Degen <br /> 1402 Third Avenue <br /> Suite 1 l00 <br /> Seattle, WA 98101 <br /> Project: Holiday Inn <br /> Job Address: 3105 Pine Street <br /> Plan Revie�v No: B0412-038, Recheck #1 <br /> Dear Mr. Degen; <br /> Further clarification is required for the following items based on the original review letter <br /> dated January 6, 2005 and the reply received on February 4, 2005. Those items not <br /> addressed below have been satisfied. The numbering is per the original con ment letter. See <br /> original letter for code reFerences not shown. <br /> In order for the processing of your app6cation to continue, it will be necessary to <br /> provide thc Building Division either with two complete new sets ot drawings reflecttng <br /> thc corrections requested or a representative from your oftice to exchange any new <br /> drawing shcets with our existing two sets. <br /> 1) New rated partitions are being created around the storage room (adjacent to the women's <br /> toilet room): <br /> a) A detail and listing should be provided on the plans. <br /> b) Doors #43, 44 & 45 should be shown to be minimum '/.-hour listed assemblies. Table <br /> 715.3 <br /> c) Although the specifications may include typical partition requirements, typical <br /> partition details should be provided on the pians as specifications are not reviewed or <br /> filmed and we do not have a copy of the specifications. <br /> 2) The various (new) steel framed roof/ceiling assemblies sho�vn in the plans reference UL <br /> Desig� �P5 t 0—the following comments are based on that listing: <br /> a) The listing is for steel joists - a listing utilizing steel beams should be provided. <br /> b) Sheet A5.1 shows R-I 1 insulation on top of the rated ceiling assembly — this is not <br /> permittcd unlcss specified in the listing. <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425) 257-8200 • Fax (425) 257-8856 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.