My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3105 PINE ST HOLIDAY INN 2018-01-01 MF Import
>
Address Records
>
PINE ST
>
3105
>
HOLIDAY INN
>
3105 PINE ST HOLIDAY INN 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 11:35:19 AM
Creation date
12/20/2018 11:30:40 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3105
Tenant Name
HOLIDAY INN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT 9Y: SCHOLTEN ROOFINO INC; 3803982857; AlAR-2-05 1 :42P�; PAOE 2 <br /> 03/02/2005 14:24 FAX 426 197 IA21 DIBBLE-ENGINEERS �001/001 <br /> Dd�� i Z- U3�1 <br /> Structural <br /> DIBBLE ENGINEERS, INC. Review <br /> Professional Suuctural Englnaaring Services <br /> 11�semo <br /> llA7�E: March 2,2005 JOB#: OS-037 <br /> TO; Beay Berendsen, Scholten Rooflng FAX#: (360)398-2857 <br /> CC: Robb Dibble, P.E., File <br /> FR(�M: Kurt Zimmers <br /> PRO.fECT: Everett Re•roof Review <br /> NO. OF?AGES (Including Cover): 5 _,. <br /> CUMMENTS: <br /> Dibble Engineers preformcd a site visit to the renovation project si�c et 3105 Pinc Sveet in <br /> Everett, VJashinaton to review the existing condicions and the as-built building plans for the <br /> proposcd re-roofing of the npproximntely six story concrete sm�cture. <br /> It ls Dibble Lngineers' understanding the new Tooting matedals will6e installed over the two <br /> existing layers of toofing. For our review,the cantracror provided loed info[maHon of 1,1 PSF <br /> maximum weight for the new roofing s,ystem and s total of 7.R PSF fnr the exisdng roofin¢ <br /> luyers. The existing conditions were determined by core drilling su�d wetghing the snmple.The <br /> exi'sting hollow core plank[oof svucture wa� verifiul by uur rcviaw of us-bwll building pinns <br /> provided by the contractor for viewing while on-sita. <br /> Uur calculations indicete a 74.2 PSF lotal dead lond for the existing conditions. With the wei¢ht <br /> of the new rooflug system install:.d over ihe exisdne roofing, lhn total Jr.xd Ioad wip bc 753 PSF <br /> for a total increase of 1.4%. Further review indicates that S"hollow core plenks spamting 26',as <br /> in this case,have approximately a superimposed loed capaoity of 51 PSF which is more then the <br /> 18,3 PSF total superimposcd load with the ne�v mof. <br /> ln summazy, it is our optton that ins[alling the new , <br /> roofing system over the existing roofing layers is wi ��r Q,� ' D 6e <br /> acceptable increase of load for this shucture. � Q.,�F.° �'c•<<C, <br /> �ibble Lngineers' review is specific ro the addressed � � � � <br /> compoiienta and did not perform any evaluation af the <br /> existing strucluro beyond the scope of this memo. �0,�!RF��S?���0 \�av <br /> P1ea5e contact us with any questions or clariflcations. � ss'�N.qL kN`, y2�� <br /> periREs i;o2i O[e � ' <br /> 25 Canh'a!fVuy. Suiru d00 Yugo ! rj( P. II3.88l.l900 <br /> KlrklanA, iVA 980lJ F, J21-l97J9?l <br />
The URL can be used to link to this page
Your browser does not support the video tag.