Laserfiche WebLink
Dege� ( � <br /> D en <br /> architecturc and intcrior design <br /> Ciry of Evcrell, 16 Fcb OS <br /> f_vercu Holiday Inn,Plans Cortcctions <br /> d. After consulting directly with Underwriters Laboratories, we conclude that <br /> there is no specific UL design for the column /beam connection as you <br /> request. We have added to Drawing A5.1 the requirement that the columns be <br /> wrapped with 2 layers of 5/R" type X gypsmn wall board per UL Design No. <br /> X526. 'This protectian is to extend to and beyond the rated ceiling. <br /> 4. One-hour rated suspended ceiling/lateral bracine <br /> See Drawing A6.1. A note has been added repeating information from our <br /> Specifications for the lateral bracing required for suspended ceilings. <br /> 7. Direction of door swing and occupant load at Pool <br /> See Drawing A3.1. The door swing has been changed. A note indicating the <br /> location of the required maximum occupant load has been added near the <br /> main entry to the pool. Our calculations for the occupant load per Table <br /> 1004.1.2 are also shown. <br /> 8. Defened si�a�packa�mittal, <br /> See Drawing ALO. Note #l0 has been added to the General Notes further <br /> defining the requirements for interior signage and indicating that it will be <br /> submitted later as a deferted submittal. <br /> We trust that you will find these corrections sufficient to demonstrate compliance <br /> with all adopted codes. Please do not hesitate to call if you have any further <br /> questions. <br /> Respectfully, <br /> . � <br /> Jeffrey S. e �n, AtA <br /> Principal <br /> cc: Mr. Tommy Lu, WAPO <br /> Mc Carl Zarelli, Merit Construction <br /> 2 � � <br />