My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3105 PINE ST HOLIDAY INN 2018-01-01 MF Import
>
Address Records
>
PINE ST
>
3105
>
HOLIDAY INN
>
3105 PINE ST HOLIDAY INN 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 11:35:19 AM
Creation date
12/20/2018 11:30:40 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3105
Tenant Name
HOLIDAY INN
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T CASCADE TESTING LABORATORY, INC. <br /> ir� ii TESTING fi INSPECTION <br /> ir.r� ii �2g I g N.E 120TH PLACE KIRKLAfJO:[423)623-9800 3EATTlE 1206�323-B�UO <br /> L�zJJ KIRKLAND,WASHINGTON 98034 FA%: 1425�B23•22Q3 EVEREfT: 1429�259OB i J <br /> October I S"', 2005 <br /> Cert No. 0503-45G <br /> City of Lverett Building Department <br /> 3200 Cedar <br /> Everett, Washington 98201 <br /> Reference: Holiday lnn Everett <br /> 3 105 Pine Street <br /> Permit No. B0412-038 <br /> Project Manager. <br /> 7'his is ro advise you that special inspections are completed for the above referenced project. <br /> Special inspections �vere performed for the following activities. <br /> I. Reinforced concrete cast in place for slab on grade pool area at eaercise room,wall infills and <br /> canopy footings <br /> 2. Gpoxied do�vels at infills <br /> 3. Shotcretc <br /> 4. Reinforced masonry for walls <br /> i. Suvcwral steel witnessing of welding tests <br /> G. Structural steel visual inspection on 2"'level mezzanine welding ofbeam fix,erection,bolting <br /> and �velding of new steel framed porch, roof structure and roof deck <br /> 7. Fireproofing and new entrance foyer& canopy <br /> S. Substrate for deck and beams <br /> 9 In-place densiry testing for parking lot replacement <br /> All work as inspected and reported conformed to Everett approved plans, specifications, Director's <br /> Rules, UBC and related codes and/or verbal or written instructions from the Engineer of Rewrd as <br /> indicaterl in our renorts <br /> Our last report is dated 09-13-0> and is number 7005. <br /> Respcctfully, <br /> Cr1SCADE TIiS"I'WG L:\I301tATOR1', INC. <br /> � �.�.t,w- <br /> �4ichele J. Guerrini <br /> Vice 1'resident <br />
The URL can be used to link to this page
Your browser does not support the video tag.