Laserfiche WebLink
I <br /> CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOLS 09/12/2013 <br /> B. Regulatory Requirements: Comply with governing EPA notification regulations before <br /> beginning selective demolition. Comply with hauling and disposal regulations of authorities <br /> having jurisdiction. <br /> C. Standards: Comply with ANSI A10.6 and NFPA 241. <br /> 1.6 PROJECT CONDITIONS <br /> A. Owner will occupy portions of site immediately adjacent to selective demolition area. Conduct <br /> selective demolition so Owner's operations will not be disrupted. <br /> 1. Comply with requirements specified in Division 1 Section"Summary." <br /> B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as <br /> far as practical. <br /> C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding <br /> with selective demolition. <br /> D. Hazardous Materials: Hazardous materials may be present in construction to be selectively <br /> demolished. <br /> 1. Do not disturb hazardous materials or items suspected of containing hazardous materials <br /> if discovered. Contact Owner's Representative immediately if suspected hazardous <br /> materials are discovered. <br /> E. Storage or sale of removed items or materials on-site is not permitted. <br /> F. Utility Service: Maintain existing utilities indicated to remain in service and protect them <br /> against damage during selective demolition operations. <br /> 1. Maintain fire-protection facilities in service during selective demolition operations. <br /> 1.7 WARRANTY <br /> A. Existing Warranties: Remove,replace,patch, and repair materials and surfaces cut or damaged <br /> during selective demolition,by methods and with materials so as not to void existing warranties. <br /> PART 2 PRODUCTS (Not Used) <br /> PART 3 -EXECUTION <br /> 3.1 EXAMINATION <br /> A. Verify that utilities have been disconnected and capped. <br /> SELECTIVE DEMOLITION 024119 -2 <br />