Laserfiche WebLink
I <br /> CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOLS 09/12/2013 <br /> SECTION 02 4119 -SELECTIVE DEMOLITION <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and other Division 1 Specification Sections,apply to this Section. <br /> 1.2 SUMMARY <br /> A. This Section includes the following: <br /> 1. Demolition and removal of selected portions of site and site structures. <br /> B. Related Sections include the following: <br /> 1. Division 1 Section"Summary" for use of premises and Owner-occupancy requirements. <br /> 2. Division 1 Section"Cutting and Patching" for cutting and patching procedures. <br /> 1.3 DEFINITIONS <br /> A. Remove: Detach items from existing construction and legally dispose of them off-site, unless <br /> indicated to be removed and salvaged or removed and reinstalled. <br /> B. Remove and Salvage: Detach items from existing construction and deliver them to Owner. <br /> C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and <br /> reinstall them where indicated. <br /> D. Existing to Remain: Existing items of construction that are not to be removed and that are not <br /> otherwise indicated to be removed,removed and salvaged,or removed and reinstalled. <br /> 1.4 SUBMITTALS <br /> A. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility <br /> licensed to accept hazardous wastes. <br /> 1.5 QUALITY ASSURANCE <br /> A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work <br /> similar in material and extent to that indicated for this Project. <br /> SELECTIVE DEMOLITION 024119- 1 <br /> I <br />