My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2019-02-01
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2019-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 7:36:13 AM
Creation date
12/21/2018 7:25:37 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOLS 09/12/2013 <br /> 3.4 SELECTIVE DEMOLITION,GENERAL <br /> A. General: Demolish and remove existing construction only to the extent required by new <br /> construction and as indicated. Use methods required to complete the Work within limitations of <br /> governing regulations and as follows: <br /> 1. Proceed with selective demolition systematically,from higher to lower level. <br /> 2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use <br /> cutting methods least likely to damage construction to remain or adjoining construction. <br /> Use hand tools or small power tools designed for sawing or grinding,not hammering and <br /> chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to <br /> remain. <br /> 3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring <br /> existing finished surfaces. <br /> 4. Do not use cutting torches. <br /> 5. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and <br /> promptly dispose of off-site. <br /> 6. Locate selective demolition equipment and remove debris and materials so as not to <br /> impose excessive loads on supporting structures. <br /> 7. Dispose of demolished items and materials promptly. <br /> B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling <br /> during selective demolition. When permitted by Architect,items may be removed to a suitable, <br /> protected storage location during selective demolition and reinstalled in their original locations <br /> after selective demolition operations are complete. <br /> 3.5 DISPOSAL OF DEMOLISHED MATERIALS <br /> A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or <br /> otherwise indicated to remain Owner's property, remove demolished materials from Project site <br /> and legally dispose of them in an EPA-approved landfill. <br /> 1. Do not allow demolished materials to accumulate on-site. <br /> 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces <br /> and areas. <br /> B. Burning: Do not burn demolished materials. <br /> C. Disposal: Transport demolished materials off Owner's property and legally dispose of them. <br /> 3.6 CLEANING <br /> A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective <br /> demolition operations. Return adjacent areas to condition existing before selective demolition <br /> operations began. <br /> END OF SECTION 024119 <br /> SELECTIVE DEMOLITION 024119 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.