Laserfiche WebLink
I <br /> CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOLS 09/12/2013 <br /> SECTION 12 9300—SITE FURNISHING <br /> PART 1 —GENERAL <br /> 1.1 DESCRIPTION OF WORK <br /> A. Work in this section includes furnishing the specified bleacher unit and securing it to the concrete pad, <br /> drinking fountain&football goal posts. <br /> 1.2 RELATED WORK SPECIFIED ELSEWHERE <br /> A. SECTION 22 4000 -Plumbing for Potable Water Systems <br /> B. SECTION 32 1600 -Concrete <br /> 1.3 QUALITY ASSURANCE <br /> A. Before proceeding,Contractor shall verify all locations and dimensions and report in writing to the Landscape <br /> Architect any deviation or conflicts between drawings,specifications and site conditions. Extra work arising <br /> from failure to do so shall be performed at the Contractor's expense. <br /> 1.4 SUBSTITUTIONS <br /> A. Requests for substitutions will be made no later than 14 days prior to bid. All information of product, <br /> catalogue cut sheets,samples and other written pertinent data will accompany substitution requests. <br /> PART 2—PRODUCTS <br /> 2.1 GENERAL <br /> A. All products supplied by Contractor will be new,as specified and delivered to the site in the Manufacturer's <br /> packaging. <br /> 2.2 BLEACHER UNIT <br /> A. Unit shall be manufactured by Southern Bleacher Co.,and as shown on drawings or approved equal. <br /> 2.3 DRINKING FOUNTAIN <br /> A. Unit shall be manufactured by Haws Co.,model:3177FR Pedestal Mounted Drinking Fountain with 6518FR <br /> valve assembly,no substitutions. <br /> 2.4 FOOTBALL GOAL POSTS <br /> A. Unit shall be manufactured by JayPro Co.,model:FBGP-600YW sold in pairs or approved equal,complete <br /> with the following features: <br /> 1. Offset is 5' <br /> SITE FURNISHING 129300-1 <br />