My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2019-02-01
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2019-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 7:36:13 AM
Creation date
12/21/2018 7:25:37 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOL 09/12/2013 <br /> SECTION 32 1100 ROCK AGGREGATE FOR SYNTHETIC TURF <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary Conditions <br /> apply to this section. <br /> 1.2 SCOPE OF WORK <br /> A. The work includes furnishing all labor, materials, tools and equipment necessary to properly construct <br /> and install in place all base aggregate rock including the 2"top leveling course. <br /> 1.3 RELATED WORK <br /> A. Section 33 4600 -Drainage and Subgrade Establishment <br /> 1.4 SUBMITTALS <br /> A. Submit the following within 14 days after award of contract. <br /> 1. Representative sample of 4"base rock. <br /> 2. Representative sample of 2"top leveling course <br /> 1.5 QUALITY ASSURANCE <br /> A. Testing of the rock will be done at the offsite supply location one week prior to delivery of any <br /> material. Six (6) samples will be taken from the stockpile of material to be delivered to the site. <br /> Stockpiles containing non-conforming material will be rejected. Samples of materials delivered to the <br /> project will be taken at random for testing. Owner will pay for testing. All samples from offsite and <br /> onsite supply stockpiles shall meet specified requirements. <br /> B. Test sieves shall be made of square-hole,perforated plates conforming to ASTM Designation E 323. <br /> C. Testing of No. 200 and 270 sieves will be done using the wet sieve method. <br /> 1.6 Existing Conditions <br /> A. The Installation Contractor is responsible for the repair of any damage done to the existing concrete <br /> curbs,walls,fences,underground utilities, sub-base, or other utility during the performance of his work. <br /> 1.7 SURFACE AREA <br /> A. See Athletic Field Drawing Sheets for layout. Contractor will verify all measurements and dimensions. <br /> ROCK AGGREGATE 32 1100 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.