Laserfiche WebLink
SUMMARY OF THE WORK <br /> 010100 - 1 <br /> SECTION 010100 - SUMMARY OF THE WORK <br /> 1. PART 1 - GENERAL <br /> 1.1 Project Identification: <br /> Cascade High School Synthetic Turf Field <br /> Cascade High School - 801 E. Casino Road, Everett, WA 98203 <br /> 1.2 Consultants: <br /> Architect: CNJA Architects, Inc. <br /> 2722 Colby Avenue, Suite 607 <br /> Everett, WA 98201 <br /> Landscape Architect: Design Two Four/Two Six, Inc. <br /> P.O. Box 258 <br /> 6619-132nd Avenue NE. <br /> Kirkland, WA 98033-8627 <br /> 1.3 Abbreviated Written Summary: Briefly and without force and effect on requirements <br /> of the Contract Documents, the description of the Work of the Contract can be <br /> summarized as follows: <br /> A. General Description of Work (including Base Bid and Alternates): <br /> Base Bid: Remove existing natural turf football/soccer field including, <br /> turf, sand base, goal posts,and irrigation system. Repair existing drainage <br /> system, install new wash system, filter fabric, drainage base course <br /> material, and shock pad. Install new asphalt paving and concrete pad. <br /> Install new football goal posts, drinking fountain and permanent bleachers. <br /> Installation and materials for electrical infrastructure, including conduit <br /> and wiring to poles,panels, transformer, and hand holes. <br /> Alternate Bid No. 1A: All labor and materials associated with installation <br /> of infilled synthetic turf by"FieldTurf' <br /> Alternate Bid No. 1B: All labor and materials associated with installation <br /> of infilled synthetic turf by"SprinTurf' <br /> Alternate Bid No. 2A: All labor and materials associated with installation <br /> of sports lighting, including concrete base foundations for steel poles by <br /> "Musco" <br /> Alternate Bid No. 2B: All labor and materials associated with installation <br /> of sports lighting, including concrete base foundations for steel poles by <br /> "Hubbell" <br /> 02/19/13 <br /> I <br />