My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2019-02-01
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2019-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 7:36:13 AM
Creation date
12/21/2018 7:25:37 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULES, REPORTS <br /> 013100 -2 <br /> 1. Initial Progress Meeting: Schedule initial progress meeting(recognized as <br /> "Pre-Construction Meeting")before starting construction, at a time <br /> convenient to the Contractor, Owner, and Architect, but no later than 15 <br /> days after the Notice To Proceed. Use it as an organizational meeting, <br /> review responsibilities,personnel assignments, and communication chain. <br /> 2. Reporting: Within 3 days after each progress meeting date, distribute <br /> copies of minutes-of-the-meeting to each entity present and to others who <br /> should have been present. Include a brief summary(in narrative form) of <br /> progress of the work since previous meeting and report. The Owner's <br /> Representative will also make his meeting notes available to all parties. <br /> 3. Schedule Updating: Immediately following each progress meeting, where <br /> revisions to progress schedule have been made or recognized, revise <br /> progress schedule. Reissue revised schedule concurrently with report of <br /> each meeting. <br /> End of Section 013100 <br /> 02/19/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.