Laserfiche WebLink
SCHEDULE OF VALUES <br /> 013700-2 <br /> 1.5. Submittal: <br /> 1. Within ten days of receiving the Notice To Proceed,the Contractor shall <br /> submit six copies of a balanced Schedule of Values for the Architect to <br /> review. The form and content shall be acceptable to the Architect. If in the <br /> opinion of the Architect, the Schedule of Values is unbalanced the <br /> Contractor will be required to present documentation substantiating the <br /> cost allocations of those activities believed to be unbalanced. The revised <br /> Schedule of Values shall be the basis for progress payments throughout the <br /> duration of the Project. <br /> END OF SECTION 013700 <br /> 02/19/13 <br />