Laserfiche WebLink
/1/0'-/ <br /> $T14 <br /> Sound 44-; <br /> %EERs, <br /> April 24, 2017� <br /> i l�3 , <br /> '‘g 2-41( <br /> o'uIth� <br /> ION <br /> Gary McConaghy <br /> Belfor Restoration <br /> Forwarded via e-mail: garv.mcconaghy(a us.belfor.com <br /> RE: Fire Damage Report/Equipment Schedule <br /> Sugar Shak <br /> 3710 West Mikilteo Blvd <br /> Everett, WA 98203 <br /> Parcel #00433600004700 <br /> Mr. McConaghy, <br /> The purpose of this correspondence is to provide an assessment of fire/smoke damage <br /> to the above referenced building as well as an equipment schedule as requested by the <br /> city. Fire was reportedly caused by a ceiling hung gas fired unit heater located within the <br /> Pottery Studio. <br /> FIRE/SMOKE DAMAGE <br /> Following removal of interior ceiling finishes, observation revealed minor smoke <br /> damage only to the roof joists and perpendicular roof joist support beam located in the <br /> vicinity of the unit heater. Gypsum drywall has been removed from interior walls of the <br /> Electric Kiln Area, Pottery Studio and adjoining hallway due to smoke damage. <br /> Additionally, exterior windows and door of the Pottery Studio received smoke damage. <br /> The window and door frames will be cleaned and reused. All other rooms and areas of <br /> the space appear to be undamaged. <br /> Minor fire char damage was noted to the upper most portion of the 6x6 post providing <br /> support for the perpendicular beam. The post will be replaced in like kind per plan. No <br /> other fire char damage was reported or observed. <br /> SOUND INVESTIGATIVE ENGINEERS, LLC <br /> 1802 "A"Street SE,#223 <br /> Auburn, WA 98002 <br /> (206) 621-1686 <br />