Laserfiche WebLink
Damage Assessment and Equipment Schedule <br /> Sugar Shak <br /> A•ril 24, 2017 <br /> age <br /> EQUIPTMENT SCHEDULE <br /> The following schematic was provided by the owner; <br /> Sugarshak Kiln Placement and Schematics <br /> ,e- Volts 240 <br /> TT SWX" 1. <br /> WATTS-10812 <br /> Phase 1 �` <br /> W 1 <br /> 80 HZ AC OOIY 14-GO <br /> Volts 240 /..C= D()/ <br /> t <br /> WATTS 8600 <br /> T o Phase 1 <br /> AC 2W <br /> Vats 240 <br /> 41111111111 AMPS 47 <br /> • <br /> WATTS 11280 <br /> Phase 1 <br /> Proper knit"clu.areecco GO'142 AC Only Hard Wire <br /> ▪ Storagec-er netirng and tired'Marc <br /> * ._.t trical 4 HVAC RRquire,nents <br /> F(otore Needs <br /> Kiln Clearances <br /> Most building codes refer to the manufacturers recorn.meleiat?ons when <br /> judging proper clearances from combustible walls.Skutt suggests that the <br /> kilns be at least 18"from any watt. Part of the reason for the clearance is to <br /> minimize the heat which is reflected back to the kilns circuit board. Kilns <br /> without circuit boards may be placed as close as 4"to a wall. <br /> When choosing a spot to locateyour kilns try and stay within a 50 ft wire run <br /> from your breaker box.If it is necessary to run the power farther then 50 ft <br /> you willneed to increase the wire gauge to the breaker box. <br /> Only one kiln runs at a time <br /> Kilns are 3 different sizes.Small Medium and Large—Specific kiln is fired depending <br /> on load size <br /> Kiln is run once a week-.Monday's or Tuesdays'when shop is closed <br /> Only the middle small kiln has a circuit board <br /> Please do not hesitate to contact me if you have any questions. <br /> Sincerely <br /> Jack Fingold, rincipal <br /> Sound Investigative Engineers, LLC <br /> 206.621.1686 <br /> [201724201tr.001] <br /> SOUND INVESTIGATIVE ENGINEERS, LLC <br /> 1802 "A" Street SE, #223 <br /> Auburn, WA 98002 <br /> (206) 621-1686 <br />