Laserfiche WebLink
P <br /> engineering p c <br /> EVERETT MEMORIAL STADIUM <br /> BASEBALL FIELD REPLACEMENT <br /> STORM DRAINAGE REPORT <br /> AUGUST 15,2017 <br /> REVISED SEPTEMBER 15,2017 <br /> PROJECT OVERVIEW <br /> This Storm Drainage Report is for the replacement of the baseball field at Everett Memorial <br /> Stadium,home of the Everett Aquasox baseball team. The project site address is 3802 Broadway in <br /> Everett,Washington. Refer to Figure 1—Vicinity Map for the site location. The project is <br /> located within the City of Everett and has been designed in accordance with the City of Everett <br /> Stormwater Management Manual (SWMM)and the 2016 ordinance to Update Everett Municipal <br /> Code 14.28,which has adopted the 2014 Department of Ecology(DOE) Stormwater Management <br /> Manual for Western Washington(SMMWW).Additionally,Everett Public Works Director Interim <br /> Policy#2-11 applies,which outlines stormwater control requirements in a combined sewer area. <br /> Refer to the minimum requirements section of this report for the project classification and the <br /> minimum requirements that are applicable to the project area. <br /> The project will include the resurfacing of the existing natural grass baseball field and clay infield. <br /> In the proposed conditions,both the outfield and infield areas will be replaced with synthetic turf <br /> surfacing. The existing underdrain system in the outfield will be retained,while a new underdrain <br /> system will be installed for the infield.The footprint of the field will remain unchanged. <br /> Existing Conditions <br /> The Everett Memorial Stadium property is one parcel(#29052900300100)with an area of <br /> approximately 28.73 acres. The project area consists of a minor league baseball stadium with a <br /> natural turf field with clay mix infield and cinder warning track. There are grandstands and <br /> bleachers to accommodate roughly 3,700 fans.The disturbance area is bounded by 38th Street to the <br /> north,the football/track facilities to the west,an open lawn area to the south,and the Everett <br /> Aquasox office facility and parking lot to the east. The total project disturbance area is <br /> approximately 123,399 square feet(2.833 acres). <br /> The project is in a combined sewer basin,as designated by the City of Everett.A 36-inch combined <br /> sewer line runs diagonally across the baseball field footprint.The existing grass outfield is <br /> currently underdrained with perforated lateral drainage pipes spaced approximately 15-feet on <br /> center running northwest-southeast.An 8-inch collector drain line running southwest-northeast <br /> conveys flow to a Type-1 catch basin located in centerfield below the field surface.From here,an <br /> 8-inch outlet connects the combined sewer system continuing to the northeast via the 36-inch <br /> combined sewer line.The infield portion of the field is not currently underdrained. <br /> Based upon the City of Everett's Critical Areas maps,the project area is not within any sensitive <br /> areas,such as erosion hazards,landslide hazards,liquefaction,or wetland areas. There are areas <br /> designated as steep slopes to the east of the field.Additionally,the project is not located within a <br /> floodway, 100-year floodplain,or stream bank area according to the Federal Emergency <br /> Management Agency(FEMA)Flood Insurance Rate Map. <br />