Laserfiche WebLink
IFjenginee <br /> The site topography of the field is relatively flat,sloping from southwest to northeast at an <br /> approximate 1.6%grade.North of the field,topography follows the road slope of 38th Street, <br /> sloping west to east at about 2%.To the east of the field, outside of the field footprint,there are <br /> steeper slopes of about 20%. <br /> Based upon the Natural Resources Conservation Service(NRCS)web soil survey map,the site <br /> soils within the project area consist mainly of Urban Land(fill). Refer to Figure 2—Soils Map for <br /> more information. <br /> MINIMUM REQUIREMENTS <br /> According to the City of Everett SWMM,a"redevelopment"is defined as a project site that has <br /> 35%or more of existing impervious coverage.The existing impervious surface coverage for the <br /> project area was delineated within AutoCAD using an aerial image for the property. Impervious <br /> surfaces included existing building roof areas,all paved surfaces,track surfacing,and bleacher <br /> areas. Refer to Figure 3—Existing Impervious Coverage. The existing impervious coverage for <br /> the total site was determined to be approximately 63.7%. Thus,the project is considered to be a <br /> redevelopment. Figures 2.1 and 2.2 were used to determine the minimum requirements applicable <br /> to the proposed project. <br /> Figure 2.1 from the Everett SWMM <br /> Start Here <br /> Does the project have <br /> 5.000 square feet or <br /> ore of new.epaceo —� See Minimum Requirement R0 <br /> w pus repacm <br /> pollutant generating Yes <br /> impervious surfaca7 <br /> No Next Question <br /> • Doeps the project r <br /> convert 3f4 acres or pops the eject have <br /> Dee'the bled add mere of rmtve 2 OOrt square feet or <br /> So000 square feet -y vegetatron to lawn or more of new <br /> rumore r more at new landscaped areas o replaced or new plus <br /> nit» No convert 2.5 acres or No replaced imrenion= <br /> more of sauna <br /> vegetation to pasture, <br /> yes Yes Yes No <br /> _ 're project <br /> Sec See Mr disturbing <br /> Re4 r: Requirerr -t.r:' + rhrtes of 7.000 <br /> tirroo.jli u= Ihrox ..:j feel or <br /> Yes more, <br /> • No <br /> See Minimum <br /> Requirement k2 <br /> Figure 2.1 Flim('hart for Determining Rcquircman%for New Develupmenl and Redevelopment <br /> LPD Engineering, PLLC Page 2 Everett Memorial Stadium Baseball Field Replacement <br /> Storm Drainage Report, September 15, 2011 <br />