Laserfiche WebLink
Building Permit Plans Checklist, pg. 3 ENV-CHK <br /> 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 <br /> Project Title: Avaire Apartments Renovation Date <br /> Applicability Code Location in Building <br /> (yes,no,na) Section Component Compliance information required in permit documents Documents Department Notes <br /> In single story buildings,provide list of enclosed areas that exceed 2,500 <br /> sf,have ceiling height greater than 15 ft,and are space types required to <br /> comply with this provision.For each area identify space type,floor area, <br /> floor to ceiling height,and any exception taken; <br /> Spaces in single For each area provide calculations for percentage of conditioned floor area <br /> No C402.4.2 story buildings located within a daylight zone including skylight and eligible sidelight <br /> requiring skylights daylight zones; <br /> For each area provide calculations for percentage of skylight area,OR; <br /> Provide calculations for skylight effective aperture(Equation C4-5); <br /> Indicate haze factor of skylight glazing material or diffuser <br /> AIR LEAKAGE <br /> No Indicate location of continuous air barrier on plans and sections; <br /> Air barrier <br /> C402.5.1.1 construction and Provide details for all joints,transitions in materials,penetrations in air <br /> No sealing barrier and note method of sealing(caulked,gasketed,or other approved <br /> method) <br /> Rooms containing Indicate that room(s)containing non-direct vent appliances is isolated from <br /> No open combustion inside the thermal envelope with a sealed air barrier, including doorway <br /> C402.5.3 fuel burning gasketing and sealing around ductwork and piping penetrations; <br /> appliances used for Indicate insulation provided in wall,floor and ceiling of the room envelope, <br /> No space conditioning and insulation required on combustion air ductwork <br /> No Access openings Indicate locations of all access openings and doors to shafts,chutes, <br /> C402.5.4 and doors to shafts, stairways and elevators; <br /> No chutes,stairways Indicate method of gasketing,weatherstripping and sealing of these <br /> and doors openings <br /> No Indicate locations of all stairway enclosure,elevator shaft and building <br /> 0402.5.5 Outdoor air intakes, pressurization relief openings,outside air intakes and exhaust openings; <br /> 0403:2:4.3 exhausts and relief Note in envelope plans that all relief,outside air intake and exhaust <br /> No openings openings shall be provided with dampers in accordance with Mechanical <br /> Section C403.2.4.3 <br /> No Indicate method of sealing between light fixture housing and wall or ceiling; <br /> C402.5.8 Recessed lighting in <br /> building envelope Note in envelope plans that all recessed lighting fixtures shall be IC rated <br /> No and have an air leakage rating not greater than 2 cfm per ASTM E283 test; <br /> include these requirements in lighting fixture schedules <br /> No C402.5.6 Loading dock seals Indicate weather seal at cargo and loading dock doors <br /> No Indicate locations and dimensions of vestibules and air curtains; <br /> No Indicate exception and criteria utilized for all building entrances and exits <br /> C402.5.7 Vestibules that do not have a vestibule or air curtain; <br /> No Indicate required performance for air curtains installed per exception 7; <br /> No For unconditioned vestibules,indicate which envelope assembly(interior <br /> or exterior)complies with the requirements for a conditioned space <br /> No Indicate on plans the air barrier boundaries and area calculations on all six <br /> sides of the air barrier; <br /> No Indicate air barrier test method in accordance with ASTM E779 or <br /> approved equivalent; <br /> No Indicate required maximum leakage rate for compliance. <br /> C103.2 Building air leakage <br /> C402.5.1.2 test Include the following requirements in project documents:(1)Submit air <br /> barrier test report to jurisdiction once test is completed;(2)If test results <br /> No exceed 0.4 cfm/ft2 at 0.3 in.wg,then visually inspect air barrier and seal <br /> noted sources of leakage;(3)Submit a follow-up report to jurisdiction <br /> noting corrective measures taken; (4)Include air barrier test report in <br /> compliance documentation provided to owner. <br /> If"no"is selected for any question, provide explanation: <br /> End of Building Permit Plans Checklist <br /> /I 2/) <br />