My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
824 W CASINO RD BLDG H 2019-03-22
>
Address Records
>
W CASINO RD
>
824
>
BLDG H
>
824 W CASINO RD BLDG H 2019-03-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 7:37:04 AM
Creation date
12/28/2018 7:31:33 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
824
Tenant Name
BLDG H
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ''` <br /> 41isr <br /> TRUE NORTH <br /> cONsrRuclx0N MANAG1MENF <br /> INC <br /> November 30,2017 <br /> City of Everett Permit Services <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> RE: Avaire Apartments—Building H- RCW 64.55 Compliance <br /> Permit#B17o2-o3o <br /> To Whom It May Concern: <br /> True North Construction Management,Inc.(TNCM)was retained by Casino-Westmont Affordable Housing <br /> Partners to provide for 3rd party inspections of the exterior envelope during the remediation process which <br /> included WRB,Siding,and Window replacements. The remediation repairs were performed utilizing plans and <br /> specifications prepared by Basis Architecture and Consulting,the project Architect. <br /> Our scope of services on this remediation included review of the envelope details and site visits to observe and <br /> document the installation of building envelope components during the course of construction as required by RCW <br /> 64.55. It is the opinion of TNCM that the project has been built in general conformance with the remediation <br /> plans and specifications as updated during construction. <br /> Should you have any questions or comments regarding this letter,please feel free to contact me. <br /> Best Regards, <br /> Jeff Samdal PE " -� <br /> Principal(Project Manager : . <br /> True North Construction Management,Inc. <br /> Cc: James Rochlin,SRI-Rochlin Construction Services JV LLC #ONAL' ' <br /> Casino-Westmont AH Partners,LLLP <br /> MAIN 206-259-5844 1 tnx 206-259-2710 j www 1:'RUENC PJ11CM CxP., PC Box 2411 i WOODINVILLE,WA 98072-2411 <br />
The URL can be used to link to this page
Your browser does not support the video tag.