Laserfiche WebLink
Responsible <br /> Official: Allan Giffen,Director Phone: (425)257-8731 <br /> Title: Planning and Community Development Responsible Official <br /> Address: 2930 Wetmore Avenue, Suite 8-A,Everett,WA 98201 <br /> Date: September 6,2016 <br /> Signature: VW ie (Zn (1'4g„..) <br /> You may appeal this determination by filing an appeal on forms provided by the Planning Department and a <br /> fee to the Planning/Community Development Permit Services Counter at 3200 Cedar Street,2nd Floor,no <br /> later than 14 days from the date the MDNS becomes final(which is after the 14-day comment period). <br /> Contact Teresa Weldon to read or ask about the procedures for SEPA appeals. <br /> NOTES: <br /> 1) A MDNS may be withdrawn in the event of significant changes in the proposal,disclosure of <br /> new significant information,misrepresentation by the applicant,or failure to comply with the <br /> condition upon which this Mitigated Determination of Non-Significance is predicated. <br /> 2) This land use permit shall terminate if applicant does not apply for a building permit within 18 <br /> months(or,with an extension,24 months),except where a time limit on the land use permit is <br /> otherwise established under federal or state law, city ordinance, or an executed development <br /> agreement. <br /> 3.) The issuance of the Determination of Non-Significance does not constitute project approval. The <br /> applicant must demonstrate and comply with all applicable requirements of Everett's Municipal Code <br /> (EMC)prior to receiving any permits. <br /> INFORMATION FOR DEVELOPER: <br /> The following information is provided for the developer's benefit. These are not SEPA conditions but are <br /> associated with other laws or requirements. All requirements are preliminary in nature,and are based upon <br /> the preliminary site plan and the ordinances in effect at time of submittal for SEPA review The proposal <br /> must comply with all ordinances in effect at the time a complete building permit application is filed, <br /> including those not specifically set forth herein. Contact the Planning Department for information regarding <br /> appeals processes for the requirements listed in this document. <br /> Public Works Comments—Sabrina Fandler—425.257.8810 <br /> A review of this project by the Engineering/Public Services Department indicates that the following <br /> conditions must be met: <br /> 1. Construction permits,inspections, and final approvals are required for this project from City of Everett <br /> Permit Services. <br /> a. A Demolition Permit is required for the re • .f the existing 5,440sf building. <br /> Final MDNS 'A#16-021 <br />