|
NEDDaDESIGN PHOTO LOG FIELD REPORT DFR 069
<br /> te: 8/4/3200;1;
<br /> � ,.,,,,,,„,„11:, f yrs L,
<br /> sew y .ox E,, '
<br /> R%ems. z �,; ,' • »J wH..,
<br /> •
<br /> L'FY ; ,,, .;:.;:,,,W2—,';,-""".''.:--"''...:,/,‘:..,""-:
<br /> „K ” , s
<br /> .,-4,,,,,,-:;.,,,. ^.. nw* `L.P ,«c',•' ^
<br /> x a-vb fr Vye :•','"""`.s•
<br /> nab
<br /> amu;
<br /> amu
<br /> 4
<br /> Comments: Lot 246-Compaction of cement-treated Comments: Lot 247-Excavation with removed loose
<br /> backfill material near the center of the lot area material near center 1/3 of building area.
<br /> k„
<br /> •
<br /> •
<br /> •
<br /> 4rirsye fit- .rw._
<br /> ,,,4i MEf: .7•1.11r‘ . i..- __ry f• $ s:.
<br /> w5
<br /> r.r,.°
<br /> •; :.,:i;,,' fid;•'' ^«c. '' ,` w. Psa
<br /> C..':''
<br /> a f
<br /> Comments: Lot 247-Excavation for west 1/3 of building Comments: Lot 247-Backfilling and compaction of west
<br /> area with compacted cement treated material for center 1/3 of building area with cement treated material
<br /> 1/3 visible to left of picture
<br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the
<br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does
<br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our firm Isnot responsible for site safety. This field reportis a
<br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the
<br /> GeoDeslgn project manager,as indicated by initials in the"Reviewed By"section.
<br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900
<br /> 9 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095
<br />
|