Laserfiche WebLink
001)4,/ll -111 " COST ESTIMATE SHEET <br /> Public Works Department <br /> Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date 7/18/18 <br /> Work Order#20050387 <br /> Service Order#00177791 <br /> Contact Person_ Telephone#_ <br /> Requested By_ <br /> Property Owner(Name) Brian&Susan Sodorff <br /> Address: 19215 18411 PL NE City Woodinville,.1 Zip 98077 <br /> Installation Location 1510 3611 St Everett,Wa 98201 <br /> Installation type/description/size/etc. Remove and replace 20'x5'x4"concrete sidewalk/walkway. <br /> The estimate includes the Street Division work group providing all labor,equipment and restoration. <br /> By signing this estimate,you give the City permission to enter upon your private property to complete the work <br /> and to use your outdoor water faucet for the project. <br /> Itemized Cost Estimate: <br /> Concrete . 5 col cr- e '104.51 d <br /> TOTAL $130.63 <br /> Prepared by: K.C.McAuliffe Date Estimate Prepared: 7/18/18 <br /> Accepted by: Representing:_ `, G_`•p O ft p, tl i <br /> (Signature) -�Z� B <br /> Please sign and return estimate to above address,Attn.Bob Sorgen <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> I <br /> 4-111— <br /> PligE515110,17441:410itiliffiGNME <br /> DO Ni S`Its1 : ` [ O <br /> Cc: Paul Kaftanski <br /> Grant Moen <br /> SN/Common\CLHRICALISTREETSWdewal EVCOSTESTIMATE SHEETl.doc <br />