Laserfiche WebLink
VIA C 5 <br /> COST ESTIMATE SHEET 7 9-fr cz <br /> Public Works Department00 ri <br /> Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date 7/18/18 <br /> Work Order # 20050387 <br /> Service Order # 00177791 <br /> Contact Person Telephone # <br /> Requested By <br /> Property Owner (Name) Brian & Susan Sodorff <br /> Address: 19215 184th PL NE City Woodinville, Wa Zip 98077 <br /> Installation Location 1510 36th St Everett, Wa 98201 <br /> Installation type/description/size/etc. Remove and replace 20'x5'x4"concrete sidewalk/walkway <br /> ❑ The estimate includes the Street Division work group providing all labor, equipment and restoration. <br /> By signing this estimate, you give the City permission to enter upon your private property to complete <br /> the work and to use your outdoor water faucet for the project. <br /> Itemized Cost Estimate: <br /> Concrete 1.25 yds concrete Cad $104.50 per yd <br /> TOTAL $130.63 <br /> Prepared by: K.C. McAuliffe Date Estimate Prepared: 7/18/18 <br /> Accepted by: Representing: <br /> (Signature) <br /> Please sign and return estimate to above address, Attn. Bob Sorgen <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> Estimate�O ly <br /> DO NOT SEND CHECK <br /> Cc: Paul Kaftanski <br /> Grant Moen <br /> S:\BSorgen\Est\151036thStCOST ESTIMATE SHEET1.doc <br />