f <br /> File No. 0643-013-00 <br /> September 6, 2018 <br /> Page 2 <br /> At 1056 the first load of utility sand backfill arrived(see attached sieve analysis, Figure 1). Dump trucks were unloading <br /> at the bottom of the access ramp in the southwest corner of the pond. Utility sand was being spread from west to east <br /> across the pond bottom using a small dozer(Photo 3). <br /> At 1330 the entire pond bottom had been excavated to Elevation 422 Feet and nearly all silty fill material had been <br /> over-excavated and removed from the pond bottom.The silty fill bowl-shaped wedge was observed to extend to the <br /> northern and southern pond edges,although it was pinching out and becoming thin at the edges.All silty fill material <br /> was removed to meet the infiltration design criteria and pond bottom preparation requirements.The over-excavated <br /> bowl-shaped area measured approximately 80 feet long by 40 feet wide by 3.5 feet deep in the center(becomes <br /> thinner toward the edges).The compacted haul road had also been removed. Utility sand continued to be brought into <br /> the pond and spread from west to east using the dozer(Photo 4).The pond bottom will be backfilled to Elevation 427 <br /> Feet,as designed.A sample of the utility sand was collected for grain size analysis(see attached Figure 1). <br /> We left the site at 1400. <br />