My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 HARDESON RD 2019-01-11
>
Address Records
>
HARDESON RD
>
7301
>
7301 HARDESON RD 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 3:07:02 PM
Creation date
1/8/2019 10:42:26 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 Introduction <br /> This Stormwater Pollution Prevention Plan(SWPPP)has been prepared as part of the NPDES <br /> stormwater permit requirements for the Underwood Gartland project located within Lot 1 and <br /> Tract 999 of the Mountain View Business Center Division 9. The approximately 12.29-acre <br /> property is located within Sections 11 and 12, Township 28 North, Range 4 East. The site <br /> address is 7301 Hardeson Rd, Everett WA 98203. <br /> The project site is currently under reclamation as a part of CEMEX's sand and gravel mining <br /> operations. This project is to incorporate the construction of the proposed Hardeson Infiltration <br /> Basin. The basin will serve the development of Lot 1 and future development of Lots 2 and 3. <br /> The purpose of this SWPPP is to describe the proposed construction activities and all temporary <br /> and permanent erosion and sediment control (TESC) measures, pollution prevention measures, <br /> inspection/monitoring activities, and recordkeeping that will be implemented during the <br /> proposed construction. The objectives of the SWPPP are to: <br /> 1. Implement Best Management Practices (BMPs)to prevent erosion and <br /> sedimentation, and to identify, reduce, eliminate or prevent stormwater <br /> contamination and water pollution from construction activity. <br /> 2. Prevent violations of surface water quality, ground water quality, or <br /> sediment management standards. <br /> 3. Prevent, during the construction phase, adverse water quality impacts <br /> including impacts on beneficial uses of the receiving water by controlling <br /> peak flow rates and volumes of stormwater runoff at the Permittee's <br /> outfalls and downstream of the outfalls. <br /> This SWPPP was prepared using the Ecology SWPPP Template downloaded from the Ecology <br /> website. This SWPPP was prepared based on the requirements set forth in the Construction <br /> Stormwater General Permit, Stormwater Management Manual for Western Washington <br /> (SWMMWW 2012 as amended in 2014). The report is divided into seven main sections with <br /> several appendices that include stormwater-related reference materials. The topics presented in <br /> the each of the main sections are: <br /> Section 1 — INTRODUCTION. This section provides a summary description of the <br /> project, and the organization of the SWPPP document. <br /> Section 2 - SITE DESCRIPTION. This section provides a detailed description of the <br /> existing site conditions, proposed construction activities, and calculated stormwater <br /> flow rates for existing conditions and post—construction conditions. <br /> Section 3 — CONSTRUCTION BMPs. This section provides a detailed description of <br /> the BMPs to be implemented based on the 13 required elements of the SWPPP. <br /> Section 4 — CONSTRUCTION PHASING AND BMP IMPLEMENTATION. This <br /> section provides a description of the timing of the BMP implementation in relation <br /> to the project schedule. <br /> UNDERWOOD GARTLAND JOHNSON 63,LLC April 2017 <br /> Stormwater Pollution Prevention Plan Page.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.