Laserfiche WebLink
Section 5—POLLUTION PREVENTION TEAM. This section identifies the appropriate <br /> contact names(emergency and non-emergency),monitoring personnel,and the onsite <br /> temporary erosion and sedimentation control inspector <br /> Section 6—INSPECTION AND MONITORING. This section provides a description of <br /> the inspection and monitoring requirements such as the parameters of concern to be <br /> monitored, sample locations, sample frequencies, and sampling methods for all <br /> stormwater discharge locations from the site. <br /> Section 7 — RECORDKEEPING. This section describes the requirements for <br /> documentation of the BMP implementation, site inspections, monitoring results, and <br /> changes to the implementation of certain BMPs due to site factors experienced during <br /> construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> Appendix A—TESC & SWPPP Plans <br /> Appendix B—Vicinity& Soil Maps <br /> Appendix C--Proposed Construction BMPs <br /> Appendix D—Alternative BMPs <br /> Appendix E—Construction Stormwater General Permit <br /> Appendix F— Site Inspection Forms (and Site Log) <br /> UNDERWOOD GARTLAND JOHNSON 63,LLC April 2017 <br /> Stormwater Pollution Prevention Plan Page 2 <br />